Final | 12/2/2005 | 12/5/2005 | 12/5/2005 | A | PASS |
Jack Frank
|
|
|
All of this work is on the exterior of the house on the alley side. We ran surface EMT from an existing WP GFCI receptacle up to a new exterior light controlled by a new photocell, toward the right end of the house. We also ran surface EMT from an existing WP receptacle(which we blanked off) to a new WP GFCI receptacle and then on up to a new exterior light controlled by a photocell, toward the left end of the house. THANKS !!! Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|