Final | 6/6/2006 | 6/7/2006 | 6/7/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/6/2006 at 3:44:31 PM. Contact: ###-####. signed card ,ok to final
|
Final | 6/6/2006 | 6/6/2006 | 6/6/2006 | P | NR |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/6/2006 at 8:48:09 AM. looked at electrical and told that we can not do final inspection without core inspection at earlier or same time.Told builder about no listing for audio cabinet and light box. Told to get blanks for lites, strap conduit, address, disposal not wired , ground wire at service shall be strapped
|
Electrical Rough-In | 5/22/2006 | 5/23/2006 | 5/23/2006 | A | PASS |
Bob Reichert
|
|
|
ceiling insp- nathan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to cover ceiling
|
Electrical Rough-In | 4/17/2006 | 4/17/2006 | 4/17/2006 | P | PART |
Bob Reichert
|
|
|
JOHN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles soffits ok to cover
|
Electrical Rough-In | 4/13/2006 | 4/13/2006 | 4/13/2006 | P | PASS |
Bob Reichert
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles walls only for ti area ok to cover
|
Electrical Rough-In | 4/12/2006 | 4/13/2006 | 4/13/2006 | A | NR |
Bob Reichert
|
|
|
john note: wall ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles met elect, meant to call for pm
|
ELE-Aging Inspection | 3/8/2006 | 3/8/2006 | 3/9/2006 | | DONE |
Bob Reichert
|
|
|
suc
|