Final | 5/17/2006 | 5/19/2006 | 5/19/2006 | A | PASS |
Pat Lass
|
|
|
call me at the contact number please!; Phone #: ###-#### Internet Inspection Request from: Steven Meredith
|
Final | 3/10/2006 | 3/13/2006 | 3/13/2006 | A | FAIL |
Pat Lass
|
|
|
Please call me at ###-#### about 20 minutes before inspection so I can meet you to let you in! Steve!; Phone #: ###-#### Internet Inspection Request from: Steven Meredith outside light is too close to hot tub
|
Electrical Rough-In | 1/16/2006 | 1/16/2006 | 1/17/2006 | A | PASS |
William E Thomas
|
|
|
Don the general contractor will be there by 9:00 AM, ###-####, thanks, Steve,; Phone #: ###-#### Internet Inspection Request from: Steven Meredith ri ok
|
Electrical Rough-In | 12/19/2005 | 12/19/2005 | 12/19/2005 | P | PART |
Jack Frank
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles kit. r/i only
|
Electrical Rough-In | 12/13/2005 | 12/14/2005 | 12/14/2005 | A | NR |
Pat Lass
|
|
|
steve ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie not ready answered a couple questions
|
Conference | 12/13/2005 | 12/14/2005 | 12/14/2005 | A | CANC |
Jim Schmer
|
|
|
steve ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie didn't need a conference, wanted a r/i only JMS
|