Final | 4/21/2006 | 4/21/2006 | 4/21/2006 | P | PASS |
Mike Kinnear
|
|
|
Alan call 1/2 prior to going; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung corrections made ok final
|
Final | 4/11/2006 | 4/12/2006 | 4/12/2006 | P | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 4/11/2006 at 5:08:01 PM. Contact: ###-####. closet not finished. install lockout on heater circuit breaker.
|
Final | 4/11/2006 | 4/11/2006 | 4/11/2006 | P | NH |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 4/11/2006 at 9:57:30 AM. Contact: ###-####. posted notice and called contractor
|
Electrical Rough-In | 12/12/2005 | 12/13/2005 | 12/13/2005 | A | PASS |
Pat Lass
|
|
|
rick ###-####
|