Final | 3/9/2006 | 3/10/2006 | 3/10/2006 | A | PASS |
Pat Lass
|
|
|
reinspection on kitchen remodel. call Tom @###-#### to be let in. Internet Inspection Request from: Andy Rose
|
Final | 3/3/2006 | 3/6/2006 | 3/6/2006 | A | FAIL |
Pat Lass
|
|
|
final inspection on kitchen remodel call Tom @###-#### so he can let you in. Internet Inspection Request from: Andy Rose 13 in counter has no recep. 210.52(C) Countertops. Kitchen GFCI recep. 200.11 Polarity of Connections.
|
Electrical Rough-In | 1/4/2006 | 1/4/2006 | 1/4/2006 | P | PASS |
Pat Lass
|
|
|
rough in inspection plus change out panel. key located under door matt, house is vacant okay to go in Internet Inspection Request from: Andy Rose
|
Electrical Rough-In | 1/3/2006 | 1/4/2006 | 1/4/2006 | A | NH |
Pat Lass
|
|
|
rough in inspection plus install new panel Internet Inspection Request from: Andy Rose no access
|