Final | 2/28/2006 | 2/28/2006 | 2/28/2006 | P | PASS |
Pat Lass
|
|
|
James -- reinspection; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
Final | 2/27/2006 | 2/27/2006 | 2/27/2006 | P | PART |
Pat Lass
|
|
|
James; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong signed T/O Ok still need show window outlets and isolate neutral in the disconnect by the service
|
Electrical Rough-In | 2/14/2006 | 2/14/2006 | 2/14/2006 | P | PASS |
Pat Lass
|
|
|
James -- for ceiling cover; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
Electrical Rough-In | 1/25/2006 | 1/26/2006 | 1/26/2006 | A | PART |
Pat Lass
|
|
|
John - for wall cover insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong walls ok service not ready. isolate neutral check LB listing instructions and strap conduit
|
Electrical Rough-In | 12/21/2005 | 12/22/2005 | 12/22/2005 | A | PART |
Pat Lass
|
|
|
jaw Note: south wall partial please call if needs; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles this for the north/demising wall
|