Final | 4/10/2006 | 4/10/2006 | 4/10/2006 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/10/2006 at 7:45:00 AM. Contact: ###-####. ok
|
Final | 4/7/2006 | 4/7/2006 | 4/7/2006 | P | NR |
Jack Frank
|
|
|
VIVIAN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles called shall install all outside light fixtures , or install blank covers, also they need to air house out paint and lacquer
|
Final | 4/7/2006 | 4/7/2006 | 4/7/2006 | A | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/7/2006 at 7:18:51 AM. Contact: ###-####. not ready contractor called in request before job was ready for final called
|
Rough-In Permanent Service | 1/16/2006 | 1/17/2006 | 1/17/2006 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/16/2006 at 8:52:49 AM. Contact: ###-####. survey posted called grd boxes complete all makeup, #12 equip grd pigtail 2 gang box left of kit sink r/i ok p/s u/g new ok
|