Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberELE06-00113
StatusFinaled
Name TRI-STATE ELECTRIC
Site Address 495 S CAPITOL BLVD
Project NameBODO BLDG #8
Customer Number 
ePlanReview 
Description
BODO BLDG #8-Hampton Inns Hotel/Garage (Tenant Completion) Electrial TI for the 235965 sq. ft eleven story high rise. Additional value of $242,000.00 ref.ele05-00855 for the remainder value
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final2/12/20072/13/20072/13/2007APASS
DetailsBob Reichert
Contact: Greg Pack Phone #: ###-#### corrections made, did not sign occ card since outstanding correction for elevator, ok to final
Final1/30/20071/31/20071/31/2007APART
DetailsBob Reichert
Contact Greg Pack Phone #: ###-#### signed t/o card, told elevator people to clear their corr notice before we can final bldg
Final1/26/20071/29/20071/29/2007APART
DetailsBob Reichert
CONTACT: GREG PACK - TEMPORARY OCCUPANCY INSPECTION Phone #: ###-#### signed struct card for hotel shell and garage foundations only, will do t/o ltr
Electrical Rough-In1/2/20071/3/20071/3/2007APART
DetailsBob Reichert
ceiling inspection 1st flr conference room//Greg Pack ###-#### clgs meeting rooms first fl, pool potting lights, heat tape, pumps in mech room ok, told plumbers pump motors shall be listed as assy and to work thru elect
Electrical Rough-In12/18/200612/19/200612/19/2006APASS
DetailsBob Reichert
Greg, ###-#### - grounding for pool pool bond for equipot. plane ok to cover
Electrical Rough-In12/12/200612/13/200612/13/2006APASS
DetailsBob Reichert
Greg, ###-#### work located in the new mechanical area ric walls only anop ok, new mech room
Electrical Rough-In11/27/200611/28/200611/28/2006APART
DetailsBob Reichert
###-#### - gregg - note: 4th floor garage ceiling and 1st floor remodel wall rough-in walls only ok to cover, dropped ceiling 4th floor anop ok to cover, told bldr to stop letting plumber do heat trace, need to see installation instructions, check loads and changes for heat trace.
Electrical Rough-In11/27/200611/28/200611/27/2006ACANC
DetailsBob Reichert
###-#### - gregg - note: 4th floor garage ceiling and 1st floor remodel wall rough-in
Electrical Rough-In11/9/200611/13/200611/13/2006APART
DetailsBob Reichert
greg Note: heat trace and pool eq room; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles light boxes as noted on plan ok
Electrical Rough-In11/9/200611/13/200611/13/2006AFAIL
DetailsBob Reichert
greg Note: ceiling ins 4th floor; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles grid damaged, wires not fastened
Final11/9/200611/13/200611/13/2006APASS
DetailsBob Reichert
greg Note: part final 5th floor; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to final anop part, rooms only
Electrical Rough-In10/6/200610/9/200610/9/2006APART
DetailsBob Reichert
craig Note: ceiling for the pool area; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ceiling pool area ok to cover anop
Final10/2/200610/3/200610/3/2006APART
DetailsBob Reichert
craig Note: partial final for the 11th floor; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 11th fl anop ok
Final9/29/200610/2/200610/2/2006APART
DetailsBob Reichert
Greg, partial for 10th floor only, please; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt rooms and ceilings anop ok
Final9/19/20069/20/20069/20/2006APART
DetailsBob Reichert
gregg - partial final on 9th floor; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley 9th fl recpts and clg except anop ok
Final9/18/20069/19/20069/19/2006APART
DetailsBob Reichert
Contact: Greg Pack - Partial final 8th floor; Phone #: ###-#### Internet Inspection Request from: Deb McCoy 8th fl recpts anop ok
Final9/13/20069/14/20069/14/2006APART
DetailsBob Reichert
Contact Greg Pack. 7th Floor and lobby inspection.; Phone #: ###-#### Internet Inspection Request from: Shelli Daylong 7th fl rooms only except fixtures and ric walls in pool and elev lobbys anop
Final9/12/20069/13/20069/13/2006APART
DetailsBob Reichert
Contact Greg Pack. Final inspection for 6th floor rooms.; Phone #: ###-#### Internet Inspection Request from: Shelli Daylong 6th fl rooms only except 610, ok to final, anop, check heater breakers, access hole for tub
Electrical Rough-In9/11/20069/12/20069/12/2006APART
DetailsBob Reichert
This is for a ceiling rough-in inspection. Contact Greg Pack ; Phone #: ###-#### Internet Inspection Request from: Shelli Daylong ok to cover anop
Electrical Rough-In8/30/20068/31/20068/31/2006APASS
DetailsWilliam E Thomas
CONTACT: GREG PACK - CEILING INSPECTION 10TH FLOOR; Phone #: ###-#### Internet Inspection Request from: Deb McCoy
1. see prints rough in ok
Electrical Rough-In8/25/20068/28/20068/28/2006APART
DetailsBob Reichert
CONTACT: GREG PACK - 11TH FLOOR ELEVATOR LOBBY INSPECTION; Phone #: ###-#### Internet Inspection Request from: Deb McCoy pool bonding ok, clgs anop ok
Electrical Rough-In8/14/20068/15/20068/15/2006APART
DetailsBob Reichert
CONTACT: GREG PACK - CEILING INSPECTION 8TH FLOOR; Phone #: ###-#### Internet Inspection Request from: Deb McCoy ceilings and walls anop ok to cover
Electrical Rough-In8/10/20068/11/20068/11/2006APART
DetailsBob Reichert
Contact: Greg Pack -Hallway ceiling inspection 6th & 7th floors; Phone #: ###-#### Internet Inspection Request from: Deb McCoy 6,7 floor hall clgs anop ok to cover
Electrical Rough-In8/8/20068/9/20068/9/2006APART
DetailsBob Reichert
contact: Greg Pack - ceiling inspection for lobby area; Phone #: ###-#### Internet Inspection Request from: Deb McCoy ok to cover lobby ceiling, 3 large rooms only, looked at 7th fl clg, ok to cover anop
Final8/7/20068/7/20068/7/2006PPART
DetailsBob Reichert
ceiling insp greg; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie clgs and walls ok to cover anop
Electrical Rough-In8/2/20068/3/20068/3/2006APART
DetailsBob Reichert
CEIKING INSPECTION - LOBBY AREA. CONTACT: GREG PACK; Phone #: ###-#### Internet Inspection Request from: Deb McCoy ceilings ok to cover anop
Electrical Rough-In7/27/20067/28/20067/28/2006APART
DetailsBob Reichert
contact: Greg Pack ceiling inspection 6th floor; Phone #: ###-#### Internet Inspection Request from: Deb McCoy ok to cover borders in halls fl 6,7 anop
Electrical Rough-In7/21/20067/24/20067/24/2006APART
DetailsBob Reichert
Contact Greg Pack. Elevator Lobby rough in inspection.; Phone #: ###-#### Internet Inspection Request from: Shelli Daylong elev lobby 5, 6 floor, bath clgs 5 fl ok to cover
Electrical Rough-In7/18/20067/19/20067/19/2006APART
DetailsBob Reichert
Contact Greg Pack. Rough-in inspection walls; Phone #: ###-#### Internet Inspection Request from: Shelli Daylong 1-5 floor stairwells, and part lobby borders anop ok to cover
Electrical Rough-In7/12/20067/13/20067/13/2006APART
DetailsBob Reichert
CONTACT: GREG PACK - CEILING ROUGH-IN ; Phone #: ###-#### Internet Inspection Request from: Deb McCoy ceilings and walls anop ok to cover
Electrical Rough-In7/6/20067/6/20067/6/2006APART
DetailsBob Reichert
ok to cover 10th and 5th floor areas anop
Electrical Rough-In6/27/20066/28/20066/28/2006PPART
DetailsBob Reichert
CONTACT: GREG PACK - CEILING INSPECTION LOBBY AREA; Phone #: ###-#### Internet Inspection Request from: Deb McCoy ceilings and walls anop ok to cover, misc floores
Electrical Rough-In6/21/20066/22/20066/22/2006APART
DetailsBob Reichert
CONTACT: GREG PACK - 11TH FLOOR CEILING INSPECTION; Phone #: ###-#### Internet Inspection Request from: Deb McCoy 11th ceilings, #2 stairs 5-11 floor, lobby anop ok to cover
Electrical Rough-In6/15/20066/16/20066/16/2006APART
DetailsBob Reichert
contact: Greg Pack - 5th floor inspection; Phone #: ###-#### Internet Inspection Request from: Deb McCoy 5th walls, 5-11 #1 stairwells anop ok to cover
Electrical Rough-In6/15/20066/15/20066/15/2006APART
DetailsBob Reichert
lobby bath walls, 6th stairwell walls ok to cover
Electrical Rough-In6/12/20066/13/20066/13/2006APART
DetailsBob Reichert
Contact Greg Pack. Ceiling rough-in 10th floor; Phone #: ###-#### Internet Inspection Request from: Shelli Daylong 10th floor clgs, 5th walls anop ok to cover
Electrical Rough-In5/31/20066/1/20066/1/2006APART
DetailsBob Reichert
Contact Greg Pack. 11th Floor rough-in inspection; Phone #: ###-#### Internet Inspection Request from: Shelli Daylong 11, 9, 7 floors anop ok to cover
Electrical Rough-In5/23/20065/24/20065/24/2006PPART
DetailsBob Reichert
CONTACT: GREG PACK - CEILING ROUGH-IN ON THE 9TH FLOOR PLEASE; Phone #: ###-#### Internet Inspection Request from: Deb McCoy 9th part ceilings, 11th part walls, lobby walls only anop ok to cover
Electrical Rough-In5/17/20065/17/20065/17/2006PPART
DetailsBob Reichert
CONTACT: GREG PACK - 8TH FLOOR CEILING ROUGH-IN; Phone #: ###-#### Internet Inspection Request from: Deb McCoy ok to cover 6th fl hard lids, 8th fl clgs, and 10th fl walls anop
Electrical Rough-In5/11/20065/12/20065/12/2006APART
DetailsBob Reichert
CONTACT: GREG PACK - 10TH FLOOR ROUGHIN INSPECTION; Phone #: ###-#### Internet Inspection Request from: Deb McCoy 10th floor walls, 8th ceilings anop ok to cover
Electrical Rough-In5/4/20065/4/20065/4/2006PPART
DetailsBob Reichert
CONTACT: GREG PACK - CEILING INSPECTION; Phone #: ###-#### Internet Inspection Request from: Deb McCoy 7th floor ceilings ok to cover anop
Electrical Rough-In5/1/20065/2/20065/2/2006APART
DetailsBob Reichert
contact: Greg Pack ceiling rough-in on 7th floor; Phone #: ###-#### Internet Inspection Request from: Deb McCoy ri ok 7th floor ceiling anop
Electrical Rough-In4/27/20064/28/20064/28/2006PPART
DetailsBob Reichert
greg//ri on the 9th floor; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa walls anop ok to cover, 9th fl
Electrical Rough-In4/19/20064/20/20064/20/2006APART
DetailsBob Reichert
CONTACT: GREG PACK - ROUGH IN CEILING INSPECTION 8TH FLOOR; Phone #: ###-#### Internet Inspection Request from: Deb McCoy ri ok clgs walls anop for 6, 7, 8, 9 floors
Electrical Rough-In4/12/20064/13/20064/13/2006APART
DetailsBob Reichert
CONTACT: GREG PACK - WALL INSPECTION ON 8TH FLOOR; Phone #: ###-#### Internet Inspection Request from: Deb McCoy 8th walls, 7th halls,walls, 6th ceilings ok to cover anop
Electrical Rough-In4/5/20064/6/20064/6/2006APART
DetailsBob Reichert
contact: greg pack - rough-in wall insp 8th floor; Phone #: ###-#### Internet Inspection Request from: Deb McCoy 8th floor walls anop ok to cover
Electrical Rough-In3/30/20063/30/20063/30/2006PPART
DetailsBob Reichert
Inspection on 7th floor. Contact Leon Sheffield; Phone #: ###-#### Internet Inspection Request from: Shelli Daylong halls on 6th, rooms on 7th anop ok to cover
Electrical Rough-In3/27/20063/27/20063/27/2006APART
DetailsBob Reichert
looket 5th and 6th floors , walls only anop ok to cover
Electrical Rough-In3/21/20063/23/20063/23/2006APART
DetailsBob Reichert
7TH FLOOR ROUGH-IN CONTACT GREG PACK; Phone #: ###-#### Internet Inspection Request from: Shelli Daylong 7th floor walls anop ok to cover
Electrical Rough-In3/16/20063/20/20063/20/2006APART
DetailsBob Reichert
CONTACT: GREG PACK - 6TH FLOOR INSPECTION; Phone #: ###-#### Internet Inspection Request from: Deb McCoy walls only 6th fl anop ok to cover
Electrical Rough-In3/10/20063/17/20063/16/2006ACANC
DetailsBob Reichert
CONTACT: LYLE DEAN - ROUGH IN INSPECTION 6TH FLOOR; Phone #: ###-#### Internet Inspection Request from: Deb McCoy Inspection cancelled from web by: Deb McCoy
Electrical Rough-In3/10/20063/16/20063/16/2006ANR
DetailsBob Reichert
CONTACT: LYLE DEAN - ROUGH IN INSPECTION 6TH FLOOR; Phone #: ###-#### Internet Inspection Request from: Deb McCoy talked to contr, they are not ready
Electrical Rough-In3/10/20063/15/20063/15/2006APART
DetailsBob Reichert
CONTACT: LYLE DEAN - ROUGH IN INSPECTION 6TH FLOOR; Phone #: ###-#### Internet Inspection Request from: Deb McCoy 4 rooms anop, walls ok to cover
Electrical Rough-In3/10/20063/14/20063/14/2006APART
DetailsBob Reichert
CONTACT: LYLE DEAN - ROUGH IN INSPECTION 6TH FLOOR; Phone #: ###-#### Internet Inspection Request from: Deb McCoy walls only anop,6th fl
Electrical Rough-In3/10/20063/13/20063/13/2006ADONE
DetailsBob Reichert
contact: Lyle Dean - 6th floor, north end; Phone #: ###-#### Internet Inspection Request from: Deb McCoy looked at same rooms to see mud rings
Electrical Rough-In3/10/20063/10/20063/10/2006PPART
DetailsBob Reichert
contact: Lyle Dean - Inpection for 6th floor, North end; Phone #: ###-#### Internet Inspection Request from: Deb McCoy walls only anop, 5 rooms
Electrical Rough-In1/23/20061/23/20061/23/2006PPART
DetailsBob Reichert
CONTACT: LYLE DEAN; Phone #: ###-#### Internet Inspection Request from: Deb McCoy walls only 1st floor garage ok to cover anop
Permanent Service1/11/20061/12/20061/12/2006APASS
DetailsBob Reichert
Contact: Lyle Dean; Phone #: ###-#### Internet Inspection Request from: Deb McCoy p/s u/g n ok