Final | 2/21/2006 | 2/22/2006 | 2/22/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 2/21/2006 at 1:00:13 PM. Contact: ###-####. ok to final
|
Electrical Rough-In | 2/12/2006 | 2/13/2006 | 2/13/2006 | A | PART |
Bob Reichert
|
|
|
rough-in inspect for The Body Shop in the mall; Phone #: ###-#### Internet Inspection Request from: todd hall ok to cover clg main area and front soffit
|
Electrical Rough-In | 2/2/2006 | 2/2/2006 | 2/2/2006 | P | PART |
Bob Reichert
|
|
|
Rough-in inspect for walls. Location is in Boise towne Square Mall. Business name is The Body Shop.; Phone #: ###-#### x Internet Inspection Request from: todd hall ric ok office and bath walls only
|