Final | 8/17/2006 | 8/17/2006 | 8/17/2006 | P | PASS |
William E Thomas
|
|
|
questions call Tim @ ###-####. Scheduled by Heather w/ Doherty Electric; Phone #: ###-#### Internet Inspection Request from: Heather Packer
|
Electrical Rough-In | 5/22/2006 | 5/23/2006 | 5/23/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/22/2006 at 1:33:22 PM. Contact: ###-####. floor heat ok
|
Electrical Rough-In | 3/9/2006 | 3/9/2006 | 3/9/2006 | P | PASS |
Mike Kinnear
|
|
|
per mike kinnear ok cover ri note survey bathroom wall light needs to be removed or a wall barrier needs to be installed from floor to ceiling in the tub area. also back door solid side need outlet in the floor.
|
Permanent Service | 2/1/2006 | 2/1/2006 | 2/1/2006 | P | PASS |
Mike Kinnear
|
|
|
per Mike K. p/s u/g reconnect ok note: panel not completed yet went over grounding when electrician.
|