Final | 4/25/2006 | 4/25/2006 | 4/25/2006 | P | PASS |
Bob Reichert
|
|
|
mike Note:if cant get in call; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to final
|
Final | 2/16/2006 | 2/16/2006 | 2/16/2006 | P | CANC |
Bob Reichert
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong see rip
|
Rough-In Permanent Service | 2/16/2006 | 2/16/2006 | 2/16/2006 | P | PASS |
Bob Reichert
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong corr made, ric ok, p/s u/g n ok
|
Rough-In Permanent Service | 2/15/2006 | 2/15/2006 | 2/15/2006 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 2/15/2006 at 6:51:41 AM. Contact: ###-####. called contr, left message, 210.52(A)(1) recpt shall be installed such that no point is over 6' from another recpt in wall line.(dining room),300.4(D) nm cable shall be 1 1/4" from edge of framing member(front room, mbr), 314.17(C) nm cable sheath shall be minimum 1/4" inside box
|