Final | 7/27/2006 | 7/27/2006 | 7/27/2006 | A | PASS |
Mike Kinnear
|
|
|
final is on detached garage behind house garage is open thanx joe; Phone #: ###-#### Internet Inspection Request from: joe wheeler ok final
|
Rough-In Permanent Service | 3/30/2006 | 3/30/2006 | 3/30/2006 | P | PASS |
Mike Kinnear
|
|
|
the ufer ground has been concreted in need inspection for service hookup. thanks joe; Phone #: ###-#### Internet Inspection Request from: joe wheeler ok cover ground with dirt p/s o/h n ok
|
Rough-In Permanent Service | 2/27/2006 | 2/27/2006 | 2/27/2006 | P | PART |
Mike Kinnear
|
|
|
need inspection on ufer bond also; Phone #: ###-#### Internet Inspection Request from: joe wheeler ok cover ri ok cover u-fer ground with concrete note service not ready until concrete poured over cu wire. called contractor
|
Rough-In Permanent Service | 2/10/2006 | 2/10/2006 | 2/10/2006 | A | FAIL |
Mike Kinnear
|
|
|
need service inspection for id power to powerup; Phone #: ###-#### Internet Inspection Request from: joe wheeler stop work to home owner NEC230.24(A) change of garage roof. note needs 20ft #4 cu under 2inch concrete for grounding electrode.
|