Final | 2/20/2006 | 2/21/2006 | 2/21/2006 | A | PASS |
Pat Lass
|
|
|
final on the morning of 02/21. Thanks; Phone #: ###-#### Internet Inspection Request from: Steve Syltie
|
Final | 2/20/2006 | 2/20/2006 | 2/21/2006 | P | CANC |
Pat Lass
|
|
|
FINAL INSPECTION THIS AFTERNOON 02/20.; Phone #: ###-#### Internet Inspection Request from: Steve Syltie holliday
|
Electrical Rough-In | 2/20/2006 | 2/20/2006 | 2/20/2006 | P | CANC |
Pat Lass
|
|
|
roiugh-in in afternoon 02/20/2006.; Phone #: ###-#### Internet Inspection Request from: Steve Syltie Inspection cancelled from web by: Steve Syltie
|
Electrical Rough-In | 2/9/2006 | 2/10/2006 | 2/10/2006 | A | PART |
Pat Lass
|
|
|
All the work on this permit is on the first floor. Need a ceiling inspection in the A.M. Thanks; Phone #: ###-#### Internet Inspection Request from: Steve Syltie west side of building ceiling ok
|