Conference | 5/3/2006 | 5/4/2006 | 5/4/2006 | A | PART |
Pat Lass
|
|
|
MIKE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles talked about grid
|
Electrical Rough-In | 5/1/2006 | 5/2/2006 | 5/2/2006 | A | PASS |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 5/1/2006 at 11:37:11 PM. Contact: ###-####.
|
Electrical Rough-In | 5/1/2006 | 5/1/2006 | 5/1/2006 | P | FAIL |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 5/1/2006 at 11:30:42 AM. Contact: ###-####. 680.23.B.4 -- POTTING COMPOUND NOT SUFFICIENT
|
Electrical Rough-In | 3/1/2006 | 3/2/2006 | 3/2/2006 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 3/1/2006 at 4:33:01 PM. Contact: ###-####. Underground pipe ok I called the contractor and gave him a heads up on the requirement for the equipotential bonding grid.
|
Electrical Rough-In | 2/17/2006 | 2/17/2006 | 2/17/2006 | P | NH |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 2/17/2006 at 11:03:11 AM. called and left message.
|
Electrical Rough-In | 2/14/2006 | 2/15/2006 | 2/15/2006 | A | PART |
Pat Lass
|
|
|
lars ###-#### pool bond and stub out for lignt ok
|