Final | 9/27/2006 | 9/28/2006 | 9/28/2006 | A | PASS |
Mike Kinnear
|
|
|
Bldg 10A wafer Fab. SUP05 Internet Inspection Request from: Ken Heller ok final
|
ELE-Aging Inspection | 8/1/2006 | 8/1/2006 | 8/1/2006 | | NR |
Mike Kinnear
|
|
|
suc
|
Electrical Rough-In | 5/30/2006 | 6/1/2006 | 6/1/2006 | A | PASS |
Mike Kinnear
|
|
|
Mike, This is the Clean room remodel in bldg 10A. SUP05 Internet Inspection Request from: Ken Heller ok cover walls only
|
Electrical Rough-In | 4/14/2006 | 4/17/2006 | 4/17/2006 | A | PART |
Mike Kinnear
|
|
|
Mike, This is the 10A Remodel. SUP05 Internet Inspection Request from: Ken Heller ok ri start on fab building 10A
|
Electrical Rough-In | 3/10/2006 | 3/16/2006 | 3/16/2006 | A | PART |
Mike Kinnear
|
|
|
Mike, This is on the Main site. SUP05 Internet Inspection Request from: Ken Heller ok ri
|