Final | 4/24/2006 | 4/24/2006 | 4/24/2006 | P | PASS |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Latisha Peltier
|
Rough-In Permanent Service | 3/2/2006 | 3/3/2006 | 3/3/2006 | A | PASS |
Pat Lass
|
|
|
###-####. Scheduled by a contractor via Hello! on 3/2/2006 at 6:08:48 PM. Contact: ###-####. R/I Ok P/S O/H R Ok
|
Conference | 3/1/2006 | 3/2/2006 | 3/2/2006 | A | NR |
Pat Lass
|
|
|
Sean; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong this is for 7 rooms
|
Rough-In Permanent Service | 2/28/2006 | 3/1/2006 | 3/1/2006 | A | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 2/28/2006 at 7:37:38 PM. Contact: ###-####. COW this job is incomplete. missing outlets and boxes. cannot tell what has been done and what is existing. I had a phone conf with Gary the electricion and told him the violations I saw and that i will require him to be on site for the next inspection so that He can show me what is being done.
|