Final | 4/24/2006 | 4/24/2006 | 4/24/2006 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 4/24/2006 at 7:55:48 AM. Contact: ###-####. corr done, ok to final
|
Final | 4/17/2006 | 4/17/2006 | 4/17/2006 | P | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 4/17/2006 at 8:16:00 AM. Contact: ###-####. called contr, left message, left corr notice, nec 210.52(A)(1) &(2) no point along wall shall be over 6' from outlet,wall space over 2' in dining area, dead outlet on wall by shelving, 408.4 circuit directory shall be evident for specific purpose and distinguish each circuit from another 110.3(B) bath fixture shall be installed and completed per mfgr instructions
|
Rough-In Permanent Service | 3/6/2006 | 3/9/2006 | 3/9/2006 | A | PASS |
Bob Reichert
|
|
|
Steve; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ric ok, p/s u/g n ok
|