Final | 7/10/2006 | 7/10/2006 | 7/10/2006 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/10/2006 at 10:07:00 AM. Contact: ###-####. corr made, ok to final
|
Final | 7/7/2006 | 7/10/2006 | 7/10/2006 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/7/2006 at 5:39:58 PM. Contact: ###-####. told elect, left corr notice, 210.52(D) recpt shall be within 3' 0f basin in mbr, 422.16(B)(2) disposal cord shall not be over 36", 406.4(D) recpt faceplate shall be flush or project from recpt face, 408.4 panelboard schedule shall be complete and accurate
|
Rough-In Permanent Service | 2/28/2006 | 3/1/2006 | 3/1/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 2/28/2006 at 3:50:32 PM. Contact: ###-####. corr made, ric ok p/s u/g n ok
|
Electrical Rough-In | 2/28/2006 | 2/28/2006 | 2/28/2006 | P | CANC |
Bob Reichert
|
|
|
###-#### - rick see rip
|
Rough-In Permanent Service | 2/28/2006 | 2/28/2006 | 2/28/2006 | P | FAIL |
Bob Reichert
|
|
|
###-#### - rick called contr, left corr notice, BCC all make-up shall be done, 210.52(A)(1) receptacles shall be installed such that no point in wall space is over 6ft from a receptacle outlet, 110.3(B) listed equipment shall be installed per instructions included in the listing (gnd crimps)
|