Permit Information
Permit NumberELE06-00711
StatusFinaled
Name POWER CITY ELECTRIC INC
Site Address 1055 N CURTIS RD
Project NameSt Al's Central Tower Addition
Customer Number20620
ePlanReview 
Description
Electrical for new central tower. Electrical service & dist power, lighting systems emergency generation - $10,759,022 per initial cert of value - cmc///Final cert of value $10,718,022 5/22/2006 cmc
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final5/27/20085/28/20085/28/2008APASS
DetailsJack Frank
todd Phone #: ###-#### ok card signed
ELE-Aging Inspection5/21/20085/21/20085/21/2008 PART
DetailsJack Frank
still waiting for contr to call
ELE-Aging Inspection3/21/20083/21/20083/21/2008 DONE
DetailsJack Frank
wsuc
Final1/18/20081/18/20081/18/2008APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 1/18/2008 at 7:01:15 AM. Contact: ###-####. cards signed fro T?O for 9th floor, and 4th floor roof garden
Final1/16/20081/16/20081/16/2008APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 1/16/2008 at 6:33:51 AM. Contact: ###-####. 9th floor 95% complete
Final1/9/20081/10/20081/10/2008APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 1/9/2008 at 7:07:14 PM. Contact: ###-####. t/o card signed 8th floor
Final1/8/20081/8/20081/8/2008APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 1/8/2008 at 6:20:20 AM. Contact: ###-####. 8th floor t/o ok correction on headboards made, 4th floor roof garden t/o ok 8th and 4th floors anop, also fix for headboards on 5th floor will comply they will call for t/o when ready
Electrical Rough-In12/26/200712/27/200712/27/2007APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 12/26/2007 at 3:59:16 PM. Contact: ###-####. conference on headboards ok, all conduits terminate with connecor into back plate
Final12/24/200712/26/200712/26/2007APART
DetailsWilliam E Thomas
. 1. as noted on prints ok. .
Final12/26/200712/26/200712/26/2007PCANC
DetailsWilliam E Thomas
Final12/21/200712/24/200712/24/2007PPART
DetailsWilliam E Thomas
. 1. as noted on prints ok. .
Final12/21/200712/24/200712/24/2007APART
DetailsWilliam E Thomas
. 1/ as mnoted on prints. .
Final12/18/200712/18/200712/18/2007APART
DetailsWilliam E Thomas
. 1. as noted on prints, area ok. .
Final12/17/200712/17/200712/17/2007PPART
DetailsWilliam E Thomas
. 1. As noted on the prints ok. .
Final12/17/200712/17/200712/17/2007PFAIL
DetailsWilliam E Thomas
. 1. Manufacturers instructions have not been followed for the bed locators in each room where the locator has been mounted on a cabinet next tothe wall. .
. 2. A seperate correction notice has been issued for each of the following floors:
. a. 2nd flr. .
. b. 3rd flr. .
. c. 4th flr. .
. d. 5th flr. .
. e. 8th flr. .
. f. 9th flr. .
. 3. The EC is waiting for more info from the manufacturer, once that arrives, a plan of action will be developed. This will affect the lower floors greatly as they are allready occupied with patients. .
Final12/17/200712/17/200712/17/2007APART
DetailsWilliam E Thomas
. 1. as noted on prints ok. .
Final12/11/200712/11/200712/11/2007PPART
DetailsWilliam E Thomas
bill
. 1. final ok in the areas that are noted on the prints. .
Final12/11/200712/11/200712/11/2007PPART
DetailsWilliam E Thomas
. 1 . final in the 8th flr areas are as noted on prints. .
Final12/6/200712/10/200712/10/2007ACANC
DetailsBob Reichert
Scheduled by a contractor via Hello! on 12/6/2007 at 7:49:01 AM. Contact: ###-####. nobody home at number, found out Ricks #509 ###-####, Bud called back, his number ###-####, talked to 432 and he will take care of
Final11/26/200711/26/200711/26/2007PPART
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 11/26/2007 at 10:07:26 AM. Contact: ###-####.
. 1. The T/O for the 5th flr is now allowed to have patients, the nurse call system is now functional. .
Final11/26/200711/26/200711/26/2007PPART
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 11/26/2007 at 10:07:26 AM. Contact: ###-####.
. 1. nurse call system on 5th flr is now operational. .
Final11/23/200711/23/200711/23/2007PPART
DetailsWilliam E Thomas
. 1. Aa noted on print ok. .
Final11/23/200711/23/200711/23/2007ACANC
DetailsWilliam E Thomas
Final11/21/200711/21/200711/21/2007PPART
DetailsWilliam E Thomas
. 1. as noted on prints ok. .
Final11/16/200711/16/200711/16/2007PFAIL
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 11/15/2007 at 3:25:34 PM. Contact: ###-####.
. 1. 210.52D. Recep required within 3ft of the basin. .
Final11/16/200711/16/200711/16/2007PPART
DetailsWilliam E Thomas
. 1. The nurse call system for the 4th floor is now operational, patient rooms ok to occupy. .
Final11/16/200711/16/200711/16/2007PPART
DetailsWilliam E Thomas
. 1. as noted on prints ok. .
Final11/14/200711/14/200711/14/2007PPART
DetailsWilliam E Thomas
. 1. as noted on prints ok. .
Final11/14/200711/14/200711/14/2007PPART
DetailsWilliam E Thomas
. 1. as noted on prints ok. .
Final11/14/200711/14/200711/14/2007PPART
DetailsWilliam E Thomas
anop
Final11/9/200711/9/200711/9/2007PPART
DetailsWilliam E Thomas
. 1. partial final as noted on prints ok. .
Final11/9/200711/9/200711/9/2007PPART
DetailsWilliam E Thomas
. 1. final, as noted on prints ok. .
. 2. out standing areas are as follows: A. Roof Garden., B. Room #47502., C. Room #47117. .
. 3. T/O is approved for the 4th Floor. .
Final11/9/200711/9/200711/9/2007PPART
DetailsWilliam E Thomas
Final11/9/200711/9/200711/9/2007PPART
DetailsWilliam E Thomas
anop
Electrical Rough-In10/30/200710/30/200710/30/2007PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 10/30/2007 at 8:17:31 AM. Contact: ###-####. walls waiting rm N tower N E corner
Final10/19/200710/19/200710/19/2007PPART
DetailsBob Reichert
to is approved for area 1 basement,1st floor,2nd, 3rd 6th floor,7th floor,penthouse per Bill Thomas
Final10/18/200710/18/200710/18/2007PPART
DetailsWilliam E Thomas
. 1. as noted on prints, final ok. .
Electrical Rough-In10/11/200710/11/200710/11/2007PPASS
DetailsWilliam E Thomas
. 1. ri ok -- as noted on prints. .
Final10/11/200710/11/200710/11/2007PPART
DetailsWilliam E Thomas
. 1. as noted on prints--final ok. .
Final10/10/200710/10/200710/10/2007PPART
DetailsWilliam E Thomas
bill
. 1. final, as noted on prints, ok. .
Electrical Rough-In10/8/200710/8/200710/8/2007APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 10/8/2007 at 6:41:30 AM. Contact: ###-####. 9th floor ceilings and entry canopy addition ceiling ok
Electrical Rough-In10/2/200710/3/200710/3/2007APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 10/2/2007 at 12:28:03 PM. Contact: ###-####.8th floor all ceilings ok
Final10/3/200710/3/200710/3/2007APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 10/2/2007 at 12:28:03 PM. Contact: ###-####. partial 1st floor lobby anop
Electrical Rough-In9/27/20079/28/20079/28/2007PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 9/27/2007 at 4:37:24 PM. all south tower grid ceilings ok anop
Electrical Rough-In9/26/20079/26/20079/26/2007PPASS
DetailsJack Frank
Scheduled by a contractor via Hello! on 9/26/2007 at 7:03:57 AM. Contact: ###-####. all ceilings 5th floor Gary will fix support for cables
Electrical Rough-In9/20/20079/21/20079/21/2007APART
DetailsJack Frank
###-#### 5th floor ceilings not ready, 3rd floor booms
ELE-Aging Inspection9/20/20079/20/20079/20/2007ACANC
DetailsJack Frank
Electrical Rough-In9/19/20079/20/20079/20/2007PCANC
DetailsJack Frank
Scheduled by a contractor via Hello! on 9/19/2007 at 7:13:34 AM. Contact: ###-####. see added AM for 09-21-07, contractor not at job site quit at 4:00 PM called no response left message
Final9/12/20079/12/20079/12/2007APART
DetailsWilliam E Thomas
PER BILL THOMAS FINAL AM
. 1. As noted on prints ok. .
Final9/7/20079/7/20079/7/2007APART
DetailsWilliam E Thomas
bill thomas
. 1. as noted on prints ok. .
Electrical Rough-In8/24/20078/27/20078/27/2007APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 8/24/2007 at 2:54:03 PM.
3rd flooor ceilings N tower
Electrical Rough-In8/15/20078/16/20078/16/2007APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 8/15/2007 at 1:05:46 PM. Contact: ###-####. u/g at entrance ok
Electrical Rough-In8/8/20078/9/20078/9/2007APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 8/8/2007 at 2:30:21 PM. Contact: ###-####. u/g ok
Electrical Rough-In8/7/20078/8/20078/8/2007PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 8/7/2007 at 2:34:57 PM. Contact: ###-####.3rd walls ceilings
Final8/7/20078/7/20078/7/2007APART
DetailsWilliam E Thomas
1. 2nd floor as noted on prints, partial final ok.
2. 2nd floor owner equipment and furniture move-in ok.
Electrical Rough-In8/7/20078/7/20078/7/2007APART
DetailsWilliam E Thomas
1. Underground for chapel garden, as noted on prints ok for cover.
Final7/31/20077/31/20077/31/2007PPART
DetailsWilliam E Thomas
1. As noted on prints ok for furniture and equipment on floor 2.
Electrical Rough-In7/31/20077/31/20077/31/2007PPART
DetailsWilliam E Thomas
scheduled by bill thomas
1. walls in rms 21120, 21121, 21122, 21123, 21149, 21150, 21151.
2. soffits in rms 21150, 21151.
3. ok for cover.
Final7/31/20077/31/20077/31/2007APART
DetailsWilliam E Thomas
1. As noted on prints ok for furniture and equipment move by the owner for the buildout.
Final7/31/20077/31/20077/31/2007PPART
DetailsWilliam E Thomas
1. Floor 1 as noted on prints--this did not include main lobby/entrance area.
2. Floor 1 is approved for owner equipment/furniture move in.
Final7/31/20077/31/20077/31/2007PPART
DetailsWilliam E Thomas
1. Basement as noted on prints.*
2. Floor 3 as noted on prints.*
3. Floor 6 as noted on prints.*
4. Floor 7 as noted on prints.*
5. Penthouse as noted on prints.*
* Please note that in each area their is the possibility of owner supplied equipment to be installed in the future. Furniture and equipment are approve for move in.*
Final7/25/20077/26/20077/26/2007APART
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 7/25/2007 at 1:11:35 PM. Contact: ###-####.
1. as noted on prints
Electrical Rough-In7/18/20077/20/20077/20/2007APART
DetailsWilliam E Thomas
joel Note: semi final Phone #: ###-####
as noted on prints
Final7/18/20077/18/20077/18/2007PCANC
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 7/18/2007 at 11:10:30 AM. Contact: ###-####.
Electrical Rough-In7/10/20077/11/20077/11/2007APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 7/10/2007 at 7:18:00 AM. Contact: ###-####. 9th floor center north and norht bowtie,2nd floor 3rd floor and basement anop
Electrical Rough-In6/29/20077/2/20077/2/2007APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 6/29/2007 at 10:05:24 AM. Contact: ###-####. 2nd floor completed ceilings ok, 4th floor roof garden and completed grid ceilings anop
Electrical Rough-In6/14/20076/14/20076/14/2007PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 6/14/2007 at 7:53:00 AM. Contact: ###-####. ok 3rd floor rms 37119,24,2037123,30303,30308 anop walls
Electrical Rough-In6/11/20076/12/20076/12/2007PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 6/11/2007 at 8:27:59 AM. Contact: ###-####. remodel new basement area, 1st floor gift shop, auditorium, main corridor ceilings, 9th floor rms east west north of elevator ok anop
Electrical Rough-In6/1/20076/4/20076/4/2007APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 6/1/2007 at 3:16:23 PM. Contact: ###-####. 2nd floor N tower rms27403, 27308, 20301 walls anop
Electrical Rough-In5/17/20075/18/20075/18/2007APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 5/17/2007 at 8:30:50 AM. Contact: ###-####. talked with Todd high entry ceiling ok for tiles
Electrical Rough-In5/10/20075/11/20075/11/2007APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 5/10/2007 at 11:43:25 AM. Contact: ###-####. 3rd floor 2 rms west bowtie, 2nd floor north tower NE corner anop
Electrical Rough-In5/2/20075/3/20075/3/2007PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 5/2/2007 at 7:58:03 AM. was done in the AM
Electrical Rough-In5/2/20075/3/20075/3/2007APART
DetailsJack Frank
8th floor NW bowtie, 2nd fl., ASU, 9th fl., 4rms NE, basement soiled laundry and corridor too S tower
Electrical Rough-In5/1/20075/2/20075/2/2007PCANC
DetailsJack Frank
Scheduled by a contractor via Hello! on 5/1/2007 at 10:57:50 AM. Contact: ###-####. called talked with Todd, will do both inspection AM & PM 05-03-07
Electrical Rough-In5/2/20075/2/20075/2/2007ACANC
DetailsJack Frank
Electrical Rough-In4/23/20074/24/20074/24/2007APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 4/23/2007 at 2:38:42 PM. Contact: ###-####. 1st floor administration and entry ceilings, 2nd floor N tower walls rms 20203,20203A, 20204, ceilings 3rd floor
Electrical Rough-In4/18/20074/18/20074/18/2007PPASS
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 4/18/2007 at 7:48:03 AM. Contact: ###-####.
RI OK AS NOTED ON THEIR LOG PRINTS
Electrical Rough-In4/4/20074/5/20074/5/2007PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 4/4/2007 at 4:19:40 PM. Contact: ###-####. part 2nd fl, board rm 2 rest rms green rm and galley anop
Electrical Rough-In3/19/20073/20/20073/20/2007PPASS
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 3/19/2007 at 7:35:41 AM. Contact: ###-####.
ri ok on 5th 8th and 1st floor as noted on the prints
Electrical Rough-In2/27/20072/28/20072/28/2007PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 2/27/2007 at 8:11:34 AM. Contact: ###-####. 5th and 8th floors anop
Electrical Rough-In2/13/20072/14/20072/14/2007APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 2/13/2007 at 9:11:35 AM. Contact: ###-####. 5th floor patient rms NW & NE center area anop, and W center stairwells anop
Electrical Rough-In2/14/20072/14/20072/14/2007APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 2/13/2007 at 9:11:35 AM. Contact: ###-####. called for info left message waiting for response
Electrical Rough-In2/5/20072/6/20072/6/2007ACANC
DetailsJack Frank
Scheduled by a contractor via Hello! on 2/5/2007 at 11:14:48 AM. Contact: ###-####. 4th floor NW 2rms right and 2 rms left of freight elevator, 5th floor SW rms behind and right and left of elevator lobby
Electrical Rough-In1/26/20071/29/20071/29/2007PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 1/26/2007 at 8:44:54 AM. Contact: ###-####. 2nd floor brain surgery rms and corridor wall, 3rd floor closet, west end center stairwell 1 thur 5 5th floor wall and 7th floor elevator lobby walls all anop
Conference1/24/20071/24/20071/24/2007PDONE
DetailsJack Frank
conference with Kent on wiring for fixtures in intensive care rm
Electrical Rough-In1/22/20071/23/20071/23/2007PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 1/22/2007 at 1:17:49 PM. Contact: ###-####. 6th floor elevator lobby, 5th floor , 4th floor, 2nd floor operating rm ceilings all anop
Electrical Rough-In1/3/20071/4/20071/4/2007PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 1/3/2007 at 2:03:45 PM. Contact: ###-####. 4th floor anop
Electrical Rough-In12/21/200612/21/200612/21/2006APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 12/21/2006 at 6:43:52 AM. Contact: ###-####. 2nd and 3rd floors anop
Electrical Rough-In12/5/200612/6/200612/6/2006PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 12/5/2006 at 1:06:17 PM. Contact: ###-####. all grid ceilings in basement ok,
part for 10th floor xformers, and panels, elevator motors need abraision protection at PHeads, clearence duct over panels shall be above 6ft
Final11/28/200611/28/200611/28/2006PPART
DetailsJack Frank
joel ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
p/o for pharmacy 1st floor ok card signed
Final11/20/200611/20/200611/21/2006PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 11/20/2006 at 9:01:03 AM. Contact: ###-####. 1st floor t/o pharmacy only survey still needs to check some recepts breaker blanks and corr. reversed polarlity no card yet
Electrical Rough-In11/21/200611/21/200611/21/2006APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 11/21/2006 at 6:44:32 AM. Contact: ###-####. 3rd &4th floor walls anop
Electrical Rough-In11/7/200611/8/200611/8/2006APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 11/7/2006 at 3:24:30 PM. Contact: ###-####. 1st floor corridors around pharmacy grid ceilings anop
Electrical Rough-In10/24/200610/25/200610/25/2006APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 10/24/2006 at 2:28:28 PM. Contact: ###-####. 1sr floor remodel in cancer center anop
Electrical Rough-In10/23/200610/23/200610/23/2006PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 10/23/2006 at 7:59:25 AM. Contact: ###-####. walls only for op rooms 5,6,7,8 anop
Electrical Rough-In10/19/200610/19/200610/19/2006PCANC
DetailsJim Schmer
Scheduled by a contractor via Hello! on 10/19/2006 at 8:14:30 AM. Contact: ###-####. rescedual for monday jms
Electrical Rough-In10/12/200610/12/200610/12/2006PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 10/12/2006 at 8:16:48 AM. Contact: ###-####. 3rd floor west corridor and alcoves, 1st floor rms 10301,3,4,8,9 17305, anop
Electrical Rough-In10/9/200610/9/200610/9/2006PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 10/9/2006 at 8:43:24 AM. Contact: ###-####. anop 2nd floor
Electrical Rough-In9/28/20069/28/20069/28/2006PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 9/28/2006 at 6:03:03 AM. Contact: ###-####. 2nd and 3rd floors anop
Electrical Rough-In9/8/20069/11/20069/11/2006APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 9/8/2006 at 6:18:24 AM. Contact: ###-####. 3rd floor and 1st floor com rm by elevator lobby anop
Electrical Rough-In9/6/20069/7/20069/7/2006PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 9/6/2006 at 3:18:32 PM. Contact: ###-####. ok anop basement corridor from elevator lobby to north tower t/o also ok
Electrical Rough-In8/31/20069/5/20069/5/2006APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 8/31/2006 at 3:05:49 PM. Contact: ###-####. 3rd floor anop walls, needs to remove duct over panels
Electrical Rough-In8/31/20069/1/20069/1/2006APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 8/31/2006 at 11:39:30 AM. Contact: ###-####. basement elevator lobby and small panel rm next to it walls anop
Electrical Rough-In8/25/20068/25/20068/25/2006PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 8/25/2006 at 8:07:49 AM. Contact: ###-####. egress stairs r/i ok
Electrical Rough-In8/21/20068/21/20068/21/2006PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 8/21/2006 at 9:22:23 AM. Contact: ###-####. 3rd floor anop
Electrical Rough-In8/16/20068/17/20068/17/2006APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 8/16/2006 at 3:38:42 PM. Contact: ###-####. called left message 2nd floor anop
Electrical Rough-In8/7/20068/7/20068/7/2006APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 8/7/2006 at 7:18:52 AM. Contact: ###-####. anop
Electrical Rough-In7/31/20068/1/20068/1/2006APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 7/31/2006 at 12:43:49 PM. Contact: ###-####. walls and soffits 3rd floor anop, and conference concerning use of flex in medical cannot be used
Electrical Rough-In7/26/20067/26/20067/26/2006APART
DetailsJack Frank
basement ceilings 2 rest rms staff area, break down rm and wall ele. lobby area, 2nd floor 5 recess fixtures west area 2 and conference operating rms
Permanent Service7/13/20067/14/20067/14/2006APASS
DetailsBob Reichert
Scheduled by a contractor via Hello! on 7/13/2006 at 11:55:45 AM. Contact: ###-####. p/s u/g n ok (sticker on north xfmr) noted on plan
Electrical Rough-In7/13/20067/14/20067/14/2006APASS
DetailsBob Reichert
Scheduled by a contractor via Hello! on 7/13/2006 at 1:12:44 PM. Contact: ###-####. added 2 floor boxes anop ok to pour
Electrical Rough-In7/12/20067/13/20067/14/2006ACANC
DetailsBob Reichert
Scheduled by a contractor via Hello! on 7/12/2006 at 2:48:52 PM. Contact: ###-####. chg to 7/14/06
Permanent Service7/12/20067/13/20067/14/2006ACANC
DetailsBob Reichert
Scheduled by a contractor via Hello! on 7/12/2006 at 10:40:53 AM. Contact: ###-####. chg to 7/14/06
Electrical Rough-In7/6/20067/7/20067/7/2006APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 7/6/2006 at 9:44:09 AM. Contact: ###-####. area e 3rd floor walls and 4 soffits anop
Electrical Rough-In7/5/20067/5/20067/5/2006PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 7/5/2006 at 9:32:43 AM. Contact: ###-####. 3rd floor exterior wall anop
Electrical Rough-In6/19/20066/20/20066/20/2006APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 6/19/2006 at 11:42:05 AM. Contact: ###-####. anop laundry chute rm and auditorium areas 5&6
Electrical Rough-In6/12/20066/13/20066/13/2006APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 6/12/2006 at 1:34:24 PM. interior side of penthouse wall and prarpet wall anop
Electrical Rough-In6/1/20066/2/20066/2/2006APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 6/1/2006 at 2:58:27 PM. Contact: ###-####. u/g for signs ok
Electrical Rough-In6/2/20066/2/20066/2/2006ANH
DetailsJack Frank
Scheduled by a contractor via Hello! on 6/1/2006 at 2:58:27 PM. Contact: ###-####. called left message, don't know where they need inspection, they are not at job trailer
Electrical Rough-In5/24/20065/25/20065/25/2006PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 5/24/2006 at 2:27:23 PM. Contact: ###-####. com rm basement, 3rms elevator lobby dir office 2nd floor anop
Electrical Rough-In4/28/20065/1/20065/1/2006PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 4/28/2006 at 1:58:34 PM. Contact: ###-####. 1st floor rest rms, rooms and corridors anop
Permanent Service4/20/20064/20/20064/20/2006PPASS
DetailsJack Frank
ray; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles p/s u/g new ok will need to relabel all services with required plaques
Electrical Rough-In4/13/20064/13/20064/13/2006PPART
DetailsJack Frank
Todd -- wall cover; call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong 2nd floor as noted on prints ok
Electrical Rough-In4/3/20064/3/20064/3/2006PPART
DetailsJack Frank
Scheduled by a contractor via Hello! on 4/3/2006 at 9:37:43 AM. 1sr floor walls by existing north tower anop ok
Conference3/28/20063/28/20063/28/2006PDONE
DetailsJack Frank
conference on use of fixture whip not allowed for branch circuit wiring to reccess fixtures, 410.67 (A B C)
Electrical Rough-In3/20/20063/22/20063/22/2006APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 3/20/2006 at 12:49:21 PM. Contact: ###-####. basement area anop also corr. 110.26(F)(1) remove drain pipe from above panel in corridor
Electrical Rough-In3/14/20063/15/20063/15/2006APART
DetailsJack Frank
7:00 am ispection 3 areas 1st floor anop, noted needs bond bushings where RE washers are used, needs bushings for rigid nipples, secure clips that secure raceways and cables, noted over 360 degrees of bends ceilings, basement anop all items where address while I was there
Electrical Rough-In3/13/20063/14/20063/14/2006PCANC
DetailsJack Frank
Scheduled by a contractor via Hello! on 3/13/2006 at 3:27:42 PM. Contact: ###-####. will do 03-15-06 in the AM
Electrical Rough-In3/10/20063/13/20063/13/2006PFAIL
DetailsMike Kinnear
Scheduled by a contractor via Hello! on 3/10/2006 at 1:39:50 PM. Contact: ###-####. some of the area already sheet rocked. told them to remove it & recall for inspection. also another area straping was really bad. told bud to look at the areas before calling for an inspection.
Electrical Rough-In2/28/20063/1/20063/1/2006APART
DetailsJack Frank
###-#### - RICK NOTE: 1ST FLOOR PHARMACY anop walls