Final | 5/27/2008 | 5/28/2008 | 5/28/2008 | A | PASS |
Jack Frank
|
|
|
todd Phone #: ###-#### ok card signed
|
ELE-Aging Inspection | 5/21/2008 | 5/21/2008 | 5/21/2008 | | PART |
Jack Frank
|
|
|
still waiting for contr to call
|
ELE-Aging Inspection | 3/21/2008 | 3/21/2008 | 3/21/2008 | | DONE |
Jack Frank
|
|
|
wsuc
|
Final | 1/18/2008 | 1/18/2008 | 1/18/2008 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/18/2008 at 7:01:15 AM. Contact: ###-####. cards signed fro T?O for 9th floor, and 4th floor roof garden
|
Final | 1/16/2008 | 1/16/2008 | 1/16/2008 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/16/2008 at 6:33:51 AM. Contact: ###-####. 9th floor 95% complete
|
Final | 1/9/2008 | 1/10/2008 | 1/10/2008 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/9/2008 at 7:07:14 PM. Contact: ###-####. t/o card signed 8th floor
|
Final | 1/8/2008 | 1/8/2008 | 1/8/2008 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/8/2008 at 6:20:20 AM. Contact: ###-####. 8th floor t/o ok correction on headboards made, 4th floor roof garden t/o ok 8th and 4th floors anop, also fix for headboards on 5th floor will comply they will call for t/o when ready
|
Electrical Rough-In | 12/26/2007 | 12/27/2007 | 12/27/2007 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/26/2007 at 3:59:16 PM. Contact: ###-####. conference on headboards ok, all conduits terminate with connecor into back plate
|
Final | 12/24/2007 | 12/26/2007 | 12/26/2007 | A | PART |
William E Thomas
|
|
|
. 1. as noted on prints ok. .
|
Final | 12/26/2007 | 12/26/2007 | 12/26/2007 | P | CANC |
William E Thomas
|
|
|
|
Final | 12/21/2007 | 12/24/2007 | 12/24/2007 | P | PART |
William E Thomas
|
|
|
. 1. as noted on prints ok. .
|
Final | 12/21/2007 | 12/24/2007 | 12/24/2007 | A | PART |
William E Thomas
|
|
|
. 1/ as mnoted on prints. .
|
Final | 12/18/2007 | 12/18/2007 | 12/18/2007 | A | PART |
William E Thomas
|
|
|
. 1. as noted on prints, area ok. .
|
Final | 12/17/2007 | 12/17/2007 | 12/17/2007 | P | PART |
William E Thomas
|
|
|
. 1. As noted on the prints ok. .
|
Final | 12/17/2007 | 12/17/2007 | 12/17/2007 | P | FAIL |
William E Thomas
|
|
|
. 1. Manufacturers instructions have not been followed for the bed locators in each room where the locator has been mounted on a cabinet next tothe wall. . . 2. A seperate correction notice has been issued for each of the following floors: . a. 2nd flr. . . b. 3rd flr. . . c. 4th flr. . . d. 5th flr. . . e. 8th flr. . . f. 9th flr. . . 3. The EC is waiting for more info from the manufacturer, once that arrives, a plan of action will be developed. This will affect the lower floors greatly as they are allready occupied with patients. .
|
Final | 12/17/2007 | 12/17/2007 | 12/17/2007 | A | PART |
William E Thomas
|
|
|
. 1. as noted on prints ok. .
|
Final | 12/11/2007 | 12/11/2007 | 12/11/2007 | P | PART |
William E Thomas
|
|
|
bill . 1. final ok in the areas that are noted on the prints. .
|
Final | 12/11/2007 | 12/11/2007 | 12/11/2007 | P | PART |
William E Thomas
|
|
|
. 1 . final in the 8th flr areas are as noted on prints. .
|
Final | 12/6/2007 | 12/10/2007 | 12/10/2007 | A | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 12/6/2007 at 7:49:01 AM. Contact: ###-####. nobody home at number, found out Ricks #509 ###-####, Bud called back, his number ###-####, talked to 432 and he will take care of
|
Final | 11/26/2007 | 11/26/2007 | 11/26/2007 | P | PART |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 11/26/2007 at 10:07:26 AM. Contact: ###-####. . 1. The T/O for the 5th flr is now allowed to have patients, the nurse call system is now functional. .
|
Final | 11/26/2007 | 11/26/2007 | 11/26/2007 | P | PART |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 11/26/2007 at 10:07:26 AM. Contact: ###-####. . 1. nurse call system on 5th flr is now operational. .
|
Final | 11/23/2007 | 11/23/2007 | 11/23/2007 | P | PART |
William E Thomas
|
|
|
. 1. Aa noted on print ok. .
|
Final | 11/23/2007 | 11/23/2007 | 11/23/2007 | A | CANC |
William E Thomas
|
|
|
|
Final | 11/21/2007 | 11/21/2007 | 11/21/2007 | P | PART |
William E Thomas
|
|
|
. 1. as noted on prints ok. .
|
Final | 11/16/2007 | 11/16/2007 | 11/16/2007 | P | FAIL |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 11/15/2007 at 3:25:34 PM. Contact: ###-####. . 1. 210.52D. Recep required within 3ft of the basin. .
|
Final | 11/16/2007 | 11/16/2007 | 11/16/2007 | P | PART |
William E Thomas
|
|
|
. 1. The nurse call system for the 4th floor is now operational, patient rooms ok to occupy. .
|
Final | 11/16/2007 | 11/16/2007 | 11/16/2007 | P | PART |
William E Thomas
|
|
|
. 1. as noted on prints ok. .
|
Final | 11/14/2007 | 11/14/2007 | 11/14/2007 | P | PART |
William E Thomas
|
|
|
. 1. as noted on prints ok. .
|
Final | 11/14/2007 | 11/14/2007 | 11/14/2007 | P | PART |
William E Thomas
|
|
|
. 1. as noted on prints ok. .
|
Final | 11/14/2007 | 11/14/2007 | 11/14/2007 | P | PART |
William E Thomas
|
|
|
anop
|
Final | 11/9/2007 | 11/9/2007 | 11/9/2007 | P | PART |
William E Thomas
|
|
|
. 1. partial final as noted on prints ok. .
|
Final | 11/9/2007 | 11/9/2007 | 11/9/2007 | P | PART |
William E Thomas
|
|
|
. 1. final, as noted on prints ok. . . 2. out standing areas are as follows: A. Roof Garden., B. Room #47502., C. Room #47117. . . 3. T/O is approved for the 4th Floor. .
|
Final | 11/9/2007 | 11/9/2007 | 11/9/2007 | P | PART |
William E Thomas
|
|
|
|
Final | 11/9/2007 | 11/9/2007 | 11/9/2007 | P | PART |
William E Thomas
|
|
|
anop
|
Electrical Rough-In | 10/30/2007 | 10/30/2007 | 10/30/2007 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/30/2007 at 8:17:31 AM. Contact: ###-####. walls waiting rm N tower N E corner
|
Final | 10/19/2007 | 10/19/2007 | 10/19/2007 | P | PART |
Bob Reichert
|
|
|
to is approved for area 1 basement,1st floor,2nd, 3rd 6th floor,7th floor,penthouse per Bill Thomas
|
Final | 10/18/2007 | 10/18/2007 | 10/18/2007 | P | PART |
William E Thomas
|
|
|
. 1. as noted on prints, final ok. .
|
Electrical Rough-In | 10/11/2007 | 10/11/2007 | 10/11/2007 | P | PASS |
William E Thomas
|
|
|
. 1. ri ok -- as noted on prints. .
|
Final | 10/11/2007 | 10/11/2007 | 10/11/2007 | P | PART |
William E Thomas
|
|
|
. 1. as noted on prints--final ok. .
|
Final | 10/10/2007 | 10/10/2007 | 10/10/2007 | P | PART |
William E Thomas
|
|
|
bill . 1. final, as noted on prints, ok. .
|
Electrical Rough-In | 10/8/2007 | 10/8/2007 | 10/8/2007 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/8/2007 at 6:41:30 AM. Contact: ###-####. 9th floor ceilings and entry canopy addition ceiling ok
|
Electrical Rough-In | 10/2/2007 | 10/3/2007 | 10/3/2007 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/2/2007 at 12:28:03 PM. Contact: ###-####.8th floor all ceilings ok
|
Final | 10/3/2007 | 10/3/2007 | 10/3/2007 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/2/2007 at 12:28:03 PM. Contact: ###-####. partial 1st floor lobby anop
|
Electrical Rough-In | 9/27/2007 | 9/28/2007 | 9/28/2007 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/27/2007 at 4:37:24 PM. all south tower grid ceilings ok anop
|
Electrical Rough-In | 9/26/2007 | 9/26/2007 | 9/26/2007 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/26/2007 at 7:03:57 AM. Contact: ###-####. all ceilings 5th floor Gary will fix support for cables
|
Electrical Rough-In | 9/20/2007 | 9/21/2007 | 9/21/2007 | A | PART |
Jack Frank
|
|
|
###-#### 5th floor ceilings not ready, 3rd floor booms
|
ELE-Aging Inspection | 9/20/2007 | 9/20/2007 | 9/20/2007 | A | CANC |
Jack Frank
|
|
|
|
Electrical Rough-In | 9/19/2007 | 9/20/2007 | 9/20/2007 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/19/2007 at 7:13:34 AM. Contact: ###-####. see added AM for 09-21-07, contractor not at job site quit at 4:00 PM called no response left message
|
Final | 9/12/2007 | 9/12/2007 | 9/12/2007 | A | PART |
William E Thomas
|
|
|
PER BILL THOMAS FINAL AM . 1. As noted on prints ok. .
|
Final | 9/7/2007 | 9/7/2007 | 9/7/2007 | A | PART |
William E Thomas
|
|
|
bill thomas . 1. as noted on prints ok. .
|
Electrical Rough-In | 8/24/2007 | 8/27/2007 | 8/27/2007 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/24/2007 at 2:54:03 PM. 3rd flooor ceilings N tower
|
Electrical Rough-In | 8/15/2007 | 8/16/2007 | 8/16/2007 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/15/2007 at 1:05:46 PM. Contact: ###-####. u/g at entrance ok
|
Electrical Rough-In | 8/8/2007 | 8/9/2007 | 8/9/2007 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/8/2007 at 2:30:21 PM. Contact: ###-####. u/g ok
|
Electrical Rough-In | 8/7/2007 | 8/8/2007 | 8/8/2007 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/7/2007 at 2:34:57 PM. Contact: ###-####.3rd walls ceilings
|
Final | 8/7/2007 | 8/7/2007 | 8/7/2007 | A | PART |
William E Thomas
|
|
|
1. 2nd floor as noted on prints, partial final ok. 2. 2nd floor owner equipment and furniture move-in ok.
|
Electrical Rough-In | 8/7/2007 | 8/7/2007 | 8/7/2007 | A | PART |
William E Thomas
|
|
|
1. Underground for chapel garden, as noted on prints ok for cover.
|
Final | 7/31/2007 | 7/31/2007 | 7/31/2007 | P | PART |
William E Thomas
|
|
|
1. As noted on prints ok for furniture and equipment on floor 2.
|
Electrical Rough-In | 7/31/2007 | 7/31/2007 | 7/31/2007 | P | PART |
William E Thomas
|
|
|
scheduled by bill thomas 1. walls in rms 21120, 21121, 21122, 21123, 21149, 21150, 21151. 2. soffits in rms 21150, 21151. 3. ok for cover.
|
Final | 7/31/2007 | 7/31/2007 | 7/31/2007 | A | PART |
William E Thomas
|
|
|
1. As noted on prints ok for furniture and equipment move by the owner for the buildout.
|
Final | 7/31/2007 | 7/31/2007 | 7/31/2007 | P | PART |
William E Thomas
|
|
|
1. Floor 1 as noted on prints--this did not include main lobby/entrance area. 2. Floor 1 is approved for owner equipment/furniture move in.
|
Final | 7/31/2007 | 7/31/2007 | 7/31/2007 | P | PART |
William E Thomas
|
|
|
1. Basement as noted on prints.* 2. Floor 3 as noted on prints.* 3. Floor 6 as noted on prints.* 4. Floor 7 as noted on prints.* 5. Penthouse as noted on prints.* * Please note that in each area their is the possibility of owner supplied equipment to be installed in the future. Furniture and equipment are approve for move in.*
|
Final | 7/25/2007 | 7/26/2007 | 7/26/2007 | A | PART |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 7/25/2007 at 1:11:35 PM. Contact: ###-####. 1. as noted on prints
|
Electrical Rough-In | 7/18/2007 | 7/20/2007 | 7/20/2007 | A | PART |
William E Thomas
|
|
|
joel Note: semi final Phone #: ###-#### as noted on prints
|
Final | 7/18/2007 | 7/18/2007 | 7/18/2007 | P | CANC |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 7/18/2007 at 11:10:30 AM. Contact: ###-####.
|
Electrical Rough-In | 7/10/2007 | 7/11/2007 | 7/11/2007 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/10/2007 at 7:18:00 AM. Contact: ###-####. 9th floor center north and norht bowtie,2nd floor 3rd floor and basement anop
|
Electrical Rough-In | 6/29/2007 | 7/2/2007 | 7/2/2007 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/29/2007 at 10:05:24 AM. Contact: ###-####. 2nd floor completed ceilings ok, 4th floor roof garden and completed grid ceilings anop
|
Electrical Rough-In | 6/14/2007 | 6/14/2007 | 6/14/2007 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/14/2007 at 7:53:00 AM. Contact: ###-####. ok 3rd floor rms 37119,24,2037123,30303,30308 anop walls
|
Electrical Rough-In | 6/11/2007 | 6/12/2007 | 6/12/2007 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/11/2007 at 8:27:59 AM. Contact: ###-####. remodel new basement area, 1st floor gift shop, auditorium, main corridor ceilings, 9th floor rms east west north of elevator ok anop
|
Electrical Rough-In | 6/1/2007 | 6/4/2007 | 6/4/2007 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/1/2007 at 3:16:23 PM. Contact: ###-####. 2nd floor N tower rms27403, 27308, 20301 walls anop
|
Electrical Rough-In | 5/17/2007 | 5/18/2007 | 5/18/2007 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/17/2007 at 8:30:50 AM. Contact: ###-####. talked with Todd high entry ceiling ok for tiles
|
Electrical Rough-In | 5/10/2007 | 5/11/2007 | 5/11/2007 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/10/2007 at 11:43:25 AM. Contact: ###-####. 3rd floor 2 rms west bowtie, 2nd floor north tower NE corner anop
|
Electrical Rough-In | 5/2/2007 | 5/3/2007 | 5/3/2007 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/2/2007 at 7:58:03 AM. was done in the AM
|
Electrical Rough-In | 5/2/2007 | 5/3/2007 | 5/3/2007 | A | PART |
Jack Frank
|
|
|
8th floor NW bowtie, 2nd fl., ASU, 9th fl., 4rms NE, basement soiled laundry and corridor too S tower
|
Electrical Rough-In | 5/1/2007 | 5/2/2007 | 5/2/2007 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/1/2007 at 10:57:50 AM. Contact: ###-####. called talked with Todd, will do both inspection AM & PM 05-03-07
|
Electrical Rough-In | 5/2/2007 | 5/2/2007 | 5/2/2007 | A | CANC |
Jack Frank
|
|
|
|
Electrical Rough-In | 4/23/2007 | 4/24/2007 | 4/24/2007 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/23/2007 at 2:38:42 PM. Contact: ###-####. 1st floor administration and entry ceilings, 2nd floor N tower walls rms 20203,20203A, 20204, ceilings 3rd floor
|
Electrical Rough-In | 4/18/2007 | 4/18/2007 | 4/18/2007 | P | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 4/18/2007 at 7:48:03 AM. Contact: ###-####. RI OK AS NOTED ON THEIR LOG PRINTS
|
Electrical Rough-In | 4/4/2007 | 4/5/2007 | 4/5/2007 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/4/2007 at 4:19:40 PM. Contact: ###-####. part 2nd fl, board rm 2 rest rms green rm and galley anop
|
Electrical Rough-In | 3/19/2007 | 3/20/2007 | 3/20/2007 | P | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 3/19/2007 at 7:35:41 AM. Contact: ###-####. ri ok on 5th 8th and 1st floor as noted on the prints
|
Electrical Rough-In | 2/27/2007 | 2/28/2007 | 2/28/2007 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/27/2007 at 8:11:34 AM. Contact: ###-####. 5th and 8th floors anop
|
Electrical Rough-In | 2/13/2007 | 2/14/2007 | 2/14/2007 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/13/2007 at 9:11:35 AM. Contact: ###-####. 5th floor patient rms NW & NE center area anop, and W center stairwells anop
|
Electrical Rough-In | 2/14/2007 | 2/14/2007 | 2/14/2007 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/13/2007 at 9:11:35 AM. Contact: ###-####. called for info left message waiting for response
|
Electrical Rough-In | 2/5/2007 | 2/6/2007 | 2/6/2007 | A | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/5/2007 at 11:14:48 AM. Contact: ###-####. 4th floor NW 2rms right and 2 rms left of freight elevator, 5th floor SW rms behind and right and left of elevator lobby
|
Electrical Rough-In | 1/26/2007 | 1/29/2007 | 1/29/2007 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/26/2007 at 8:44:54 AM. Contact: ###-####. 2nd floor brain surgery rms and corridor wall, 3rd floor closet, west end center stairwell 1 thur 5 5th floor wall and 7th floor elevator lobby walls all anop
|
Conference | 1/24/2007 | 1/24/2007 | 1/24/2007 | P | DONE |
Jack Frank
|
|
|
conference with Kent on wiring for fixtures in intensive care rm
|
Electrical Rough-In | 1/22/2007 | 1/23/2007 | 1/23/2007 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/22/2007 at 1:17:49 PM. Contact: ###-####. 6th floor elevator lobby, 5th floor , 4th floor, 2nd floor operating rm ceilings all anop
|
Electrical Rough-In | 1/3/2007 | 1/4/2007 | 1/4/2007 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/3/2007 at 2:03:45 PM. Contact: ###-####. 4th floor anop
|
Electrical Rough-In | 12/21/2006 | 12/21/2006 | 12/21/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/21/2006 at 6:43:52 AM. Contact: ###-####. 2nd and 3rd floors anop
|
Electrical Rough-In | 12/5/2006 | 12/6/2006 | 12/6/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/5/2006 at 1:06:17 PM. Contact: ###-####. all grid ceilings in basement ok, part for 10th floor xformers, and panels, elevator motors need abraision protection at PHeads, clearence duct over panels shall be above 6ft
|
Final | 11/28/2006 | 11/28/2006 | 11/28/2006 | P | PART |
Jack Frank
|
|
|
joel ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith p/o for pharmacy 1st floor ok card signed
|
Final | 11/20/2006 | 11/20/2006 | 11/21/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/20/2006 at 9:01:03 AM. Contact: ###-####. 1st floor t/o pharmacy only survey still needs to check some recepts breaker blanks and corr. reversed polarlity no card yet
|
Electrical Rough-In | 11/21/2006 | 11/21/2006 | 11/21/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/21/2006 at 6:44:32 AM. Contact: ###-####. 3rd &4th floor walls anop
|
Electrical Rough-In | 11/7/2006 | 11/8/2006 | 11/8/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/7/2006 at 3:24:30 PM. Contact: ###-####. 1st floor corridors around pharmacy grid ceilings anop
|
Electrical Rough-In | 10/24/2006 | 10/25/2006 | 10/25/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/24/2006 at 2:28:28 PM. Contact: ###-####. 1sr floor remodel in cancer center anop
|
Electrical Rough-In | 10/23/2006 | 10/23/2006 | 10/23/2006 | P | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/23/2006 at 7:59:25 AM. Contact: ###-####. walls only for op rooms 5,6,7,8 anop
|
Electrical Rough-In | 10/19/2006 | 10/19/2006 | 10/19/2006 | P | CANC |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 10/19/2006 at 8:14:30 AM. Contact: ###-####. rescedual for monday jms
|
Electrical Rough-In | 10/12/2006 | 10/12/2006 | 10/12/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/12/2006 at 8:16:48 AM. Contact: ###-####. 3rd floor west corridor and alcoves, 1st floor rms 10301,3,4,8,9 17305, anop
|
Electrical Rough-In | 10/9/2006 | 10/9/2006 | 10/9/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/9/2006 at 8:43:24 AM. Contact: ###-####. anop 2nd floor
|
Electrical Rough-In | 9/28/2006 | 9/28/2006 | 9/28/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/28/2006 at 6:03:03 AM. Contact: ###-####. 2nd and 3rd floors anop
|
Electrical Rough-In | 9/8/2006 | 9/11/2006 | 9/11/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/8/2006 at 6:18:24 AM. Contact: ###-####. 3rd floor and 1st floor com rm by elevator lobby anop
|
Electrical Rough-In | 9/6/2006 | 9/7/2006 | 9/7/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/6/2006 at 3:18:32 PM. Contact: ###-####. ok anop basement corridor from elevator lobby to north tower t/o also ok
|
Electrical Rough-In | 8/31/2006 | 9/5/2006 | 9/5/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/31/2006 at 3:05:49 PM. Contact: ###-####. 3rd floor anop walls, needs to remove duct over panels
|
Electrical Rough-In | 8/31/2006 | 9/1/2006 | 9/1/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/31/2006 at 11:39:30 AM. Contact: ###-####. basement elevator lobby and small panel rm next to it walls anop
|
Electrical Rough-In | 8/25/2006 | 8/25/2006 | 8/25/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/25/2006 at 8:07:49 AM. Contact: ###-####. egress stairs r/i ok
|
Electrical Rough-In | 8/21/2006 | 8/21/2006 | 8/21/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/21/2006 at 9:22:23 AM. Contact: ###-####. 3rd floor anop
|
Electrical Rough-In | 8/16/2006 | 8/17/2006 | 8/17/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/16/2006 at 3:38:42 PM. Contact: ###-####. called left message 2nd floor anop
|
Electrical Rough-In | 8/7/2006 | 8/7/2006 | 8/7/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/7/2006 at 7:18:52 AM. Contact: ###-####. anop
|
Electrical Rough-In | 7/31/2006 | 8/1/2006 | 8/1/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/31/2006 at 12:43:49 PM. Contact: ###-####. walls and soffits 3rd floor anop, and conference concerning use of flex in medical cannot be used
|
Electrical Rough-In | 7/26/2006 | 7/26/2006 | 7/26/2006 | A | PART |
Jack Frank
|
|
|
basement ceilings 2 rest rms staff area, break down rm and wall ele. lobby area, 2nd floor 5 recess fixtures west area 2 and conference operating rms
|
Permanent Service | 7/13/2006 | 7/14/2006 | 7/14/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/13/2006 at 11:55:45 AM. Contact: ###-####. p/s u/g n ok (sticker on north xfmr) noted on plan
|
Electrical Rough-In | 7/13/2006 | 7/14/2006 | 7/14/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/13/2006 at 1:12:44 PM. Contact: ###-####. added 2 floor boxes anop ok to pour
|
Electrical Rough-In | 7/12/2006 | 7/13/2006 | 7/14/2006 | A | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/12/2006 at 2:48:52 PM. Contact: ###-####. chg to 7/14/06
|
Permanent Service | 7/12/2006 | 7/13/2006 | 7/14/2006 | A | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/12/2006 at 10:40:53 AM. Contact: ###-####. chg to 7/14/06
|
Electrical Rough-In | 7/6/2006 | 7/7/2006 | 7/7/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/6/2006 at 9:44:09 AM. Contact: ###-####. area e 3rd floor walls and 4 soffits anop
|
Electrical Rough-In | 7/5/2006 | 7/5/2006 | 7/5/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/5/2006 at 9:32:43 AM. Contact: ###-####. 3rd floor exterior wall anop
|
Electrical Rough-In | 6/19/2006 | 6/20/2006 | 6/20/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/19/2006 at 11:42:05 AM. Contact: ###-####. anop laundry chute rm and auditorium areas 5&6
|
Electrical Rough-In | 6/12/2006 | 6/13/2006 | 6/13/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/12/2006 at 1:34:24 PM. interior side of penthouse wall and prarpet wall anop
|
Electrical Rough-In | 6/1/2006 | 6/2/2006 | 6/2/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/1/2006 at 2:58:27 PM. Contact: ###-####. u/g for signs ok
|
Electrical Rough-In | 6/2/2006 | 6/2/2006 | 6/2/2006 | A | NH |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/1/2006 at 2:58:27 PM. Contact: ###-####. called left message, don't know where they need inspection, they are not at job trailer
|
Electrical Rough-In | 5/24/2006 | 5/25/2006 | 5/25/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/24/2006 at 2:27:23 PM. Contact: ###-####. com rm basement, 3rms elevator lobby dir office 2nd floor anop
|
Electrical Rough-In | 4/28/2006 | 5/1/2006 | 5/1/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/28/2006 at 1:58:34 PM. Contact: ###-####. 1st floor rest rms, rooms and corridors anop
|
Permanent Service | 4/20/2006 | 4/20/2006 | 4/20/2006 | P | PASS |
Jack Frank
|
|
|
ray; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles p/s u/g new ok will need to relabel all services with required plaques
|
Electrical Rough-In | 4/13/2006 | 4/13/2006 | 4/13/2006 | P | PART |
Jack Frank
|
|
|
Todd -- wall cover; call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong 2nd floor as noted on prints ok
|
Electrical Rough-In | 4/3/2006 | 4/3/2006 | 4/3/2006 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/3/2006 at 9:37:43 AM. 1sr floor walls by existing north tower anop ok
|
Conference | 3/28/2006 | 3/28/2006 | 3/28/2006 | P | DONE |
Jack Frank
|
|
|
conference on use of fixture whip not allowed for branch circuit wiring to reccess fixtures, 410.67 (A B C)
|
Electrical Rough-In | 3/20/2006 | 3/22/2006 | 3/22/2006 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/20/2006 at 12:49:21 PM. Contact: ###-####. basement area anop also corr. 110.26(F)(1) remove drain pipe from above panel in corridor
|
Electrical Rough-In | 3/14/2006 | 3/15/2006 | 3/15/2006 | A | PART |
Jack Frank
|
|
|
7:00 am ispection 3 areas 1st floor anop, noted needs bond bushings where RE washers are used, needs bushings for rigid nipples, secure clips that secure raceways and cables, noted over 360 degrees of bends ceilings, basement anop all items where address while I was there
|
Electrical Rough-In | 3/13/2006 | 3/14/2006 | 3/14/2006 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/13/2006 at 3:27:42 PM. Contact: ###-####. will do 03-15-06 in the AM
|
Electrical Rough-In | 3/10/2006 | 3/13/2006 | 3/13/2006 | P | FAIL |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 3/10/2006 at 1:39:50 PM. Contact: ###-####. some of the area already sheet rocked. told them to remove it & recall for inspection. also another area straping was really bad. told bud to look at the areas before calling for an inspection.
|
Electrical Rough-In | 2/28/2006 | 3/1/2006 | 3/1/2006 | A | PART |
Jack Frank
|
|
|
###-#### - RICK NOTE: 1ST FLOOR PHARMACY anop walls
|