Final | 8/15/2006 | 8/16/2006 | 8/16/2006 | A | PASS |
Jack Frank
|
|
|
final on house contact number carl-###-####, or joe ###-####; Phone #: ###-#### Internet Inspection Request from: joe wheeler ok
|
Rough-In Permanent Service | 3/17/2006 | 3/17/2006 | 3/17/2006 | P | PASS |
Jack Frank
|
|
|
house is locked you need to call ###-#### 30 min. prior for access; Phone #: ###-#### Internet Inspection Request from: joe wheeler corrections made permit updated to 5 rms r/i ok p/s o/h rec. ok
|
Rough-In Permanent Service | 3/16/2006 | 3/17/2006 | 3/17/2006 | A | FAIL |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: joe wheeler corr. do not cover, and fee due posted needs to update permit to 5 rooms called 300.4 (A)(1)(D) nail plates and 11/4" everywhere, 110.3(A&B) GEC shall terminate into one terminal only at p/s, 210.52(A,B,C) nedds outlet wall new wall space kit, also countertop spacing over 4ft between recepts, 250.24(A)(1) all water grds and bonds shall terminate at service not subpanel bond hot and cold where is it?
|