Final | 5/11/2006 | 5/12/2006 | 5/12/2006 | A | PASS |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Latisha Peltier no card
|
Permanent Service | 4/25/2006 | 4/25/2006 | 4/25/2006 | P | PASS |
Pat Lass
|
|
|
Internet Inspection Request from: Latisha Peltier P/S O/H R Ok
|
Permanent Service | 4/13/2006 | 4/14/2006 | 4/14/2006 | A | PART |
Pat Lass
|
|
|
Footing needs inspected for ground.; Phone #: ###-#### Internet Inspection Request from: Latisha Peltier Electrode is ok for concrete. remove main bonding jumper from sub panel and run grounding electrode conductor through the connector.
|
Rough-In Permanent Service | 3/31/2006 | 3/31/2006 | 3/31/2006 | P | CANC |
William E Thomas
|
|
|
Phone #: ###-#### Internet Inspection Request from: Latisha Peltier
|
Permanent Service | 3/31/2006 | 3/31/2006 | 3/31/2006 | P | FAIL |
William E Thomas
|
|
|
Phone #: ###-#### Internet Inspection Request from: Latisha Peltier B.C.C.- needs a concrete encased electrode
|
Electrical Rough-In | 3/31/2006 | 3/31/2006 | 3/31/2006 | P | PASS |
William E Thomas
|
|
|
Phone #: ###-#### Internet Inspection Request from: Latisha Peltier ri ok
|