DOC - Permit Finaled | 6/9/2006 | 6/9/2006 | 6/9/2006 | P | PASS |
Pat Lass
|
|
|
|
Electrical Rough-In | 6/8/2006 | 6/9/2006 | 6/9/2006 | A | PASS |
Pat Lass
|
|
|
dan - reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Final | 6/8/2006 | 6/8/2006 | 6/8/2006 | P | FAIL |
Pat Lass
|
|
|
james suite 520; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley 314.23 (d)(2) support wires to be taut.
|
Final | 6/7/2006 | 6/7/2006 | 6/7/2006 | P | FAIL |
William E Thomas
|
|
|
james; suite 520 Phone #: ###-#### Internet Inspection Request from: Barbara Buckley 1. Unable to fully inspect the cieling. 2. Remove all cieling tiles
|
Final | 5/24/2006 | 5/25/2006 | 5/25/2006 | A | PART |
Pat Lass
|
|
|
erin ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles T/O ok open ceiling for final
|
Electrical Rough-In | 4/24/2006 | 4/25/2006 | 4/25/2006 | A | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 4/24/2006 at 10:53:36 AM. Contact: ###-####. no perminent lighting
|
Electrical Rough-In | 4/10/2006 | 4/10/2006 | 4/10/2006 | P | PASS |
William E Thomas
|
|
|
any questions please call Joel Smith; Phone #: ###-#### Internet Inspection Request from: Jeff Radford floor cables ok
|