Final | 12/29/2006 | 1/4/2007 | 1/4/2007 | A | PASS |
Mike Kinnear
|
|
|
This is an old tool install in building 80 cleanroom. This was permitted before I took over building 80. This SEM tool has been done for some time. I need to get it finaled. John Davis, SUP06; Phone #: ###-#### Internet Inspection Request from: John Davis ok final
|
ELE-Aging Inspection | 12/29/2006 | 12/29/2006 | 1/3/2007 | | NR |
Mike Kinnear
|
|
|
suc
|
ELE-Aging Inspection | 9/28/2006 | 9/28/2006 | 9/28/2006 | | NR |
Mike Kinnear
|
|
|
t/w ken still under construction
|
ELE-Aging Inspection | 7/26/2006 | 7/26/2006 | 7/26/2006 | | NR |
Mike Kinnear
|
|
|
suc
|