Electrical Rough-In | 6/6/2006 | 6/7/2006 | 6/7/2006 | A | PART |
Pat Lass
|
|
|
###-#### - ed Note: please inspect before 10:00 am is possible partial hot tub bonding ok
|
Electrical Rough-In | 5/3/2006 | 5/4/2006 | 5/4/2006 | P | FAIL |
William E Thomas
|
|
|
ROUGH-IN FOR BONDING FOR SPA (FROM SPA TO EQUIPMENT PAD); Phone #: ###-#### Internet Inspection Request from: Barry Kendall 680.26B2 pool light needs to be bonded to forming shell
|
Electrical Rough-In | 5/2/2006 | 5/3/2006 | 5/3/2006 | P | NR |
Pat Lass
|
|
|
ROUGH-IN INSPECTION - BONDING FOR SPA(FROM SPA TO EQUIPMENT PAD) THANKS; Phone #: ###-#### Internet Inspection Request from: Barry Kendall
|
Electrical Rough-In | 5/2/2006 | 5/2/2006 | 5/2/2006 | P | CANC |
Pat Lass
|
|
|
BONDING FOR SPA (FROM SPA TO EQUIPMENT PAD) CONTACT: BARRY @ ###-####; Phone #: ###-#### Internet Inspection Request from: Barry Kendall Inspection cancelled from web by: Barry Kendall
|