Final | 6/20/2006 | 6/20/2006 | 6/20/2006 | P | PASS |
Jack Frank
|
|
|
Tyler; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok
|
Electrical Rough-In | 6/13/2006 | 6/13/2006 | 6/13/2006 | P | PASS |
Jack Frank
|
|
|
###-#### - tyler ok corr. made
|
Electrical Rough-In | 6/12/2006 | 6/13/2006 | 6/13/2006 | A | FAIL |
Jack Frank
|
|
|
morgan; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley corr. not made called box fill liv rm westand east wall steel cutins and gas range outlet
|
Electrical Rough-In | 6/8/2006 | 6/9/2006 | 6/9/2006 | A | FAIL |
Jack Frank
|
|
|
Internet Inspection Request from: Tyler Bowen corr. fee due called314.16 box fill ,314.43 screws in plastic boxes, 314.17(A&C) replace all boxes cutin and 2 gang with broken clamps, 210.70 needs fixture or fixtures too light stairs, 210.52(A) outlet spacing
|
Electrical Rough-In | 5/23/2006 | 5/23/2006 | 5/23/2006 | P | FAIL |
Jack Frank
|
|
|
MORGAN; Phone #: ###-#### Internet Inspection Request from: Sean DeLacy need to meet contractor box fill screws in plastic boxes,broken clamps cutin boxes, recept spacing kit ,D W, disposal circuits
|
Electrical Rough-In | 5/22/2006 | 5/22/2006 | 5/22/2006 | P | NH |
Jack Frank
|
|
|
MORGAN; Phone #: ###-#### Internet Inspection Request from: Sean DeLacy notice posted called
|
Permanent Service | 5/8/2006 | 5/8/2006 | 5/8/2006 | P | PASS |
Jack Frank
|
|
|
###-#### - tyler p/s o/h rec. ok
|
Permanent Service | 5/5/2006 | 5/8/2006 | 5/8/2006 | A | CANC |
Bob Reichert
|
|
|
Internet Inspection Request from: Tyler Bowen called contr, said permit not up to date, no p/s and only 3 rooms, said to recall when correct
|
Conference | 5/2/2006 | 5/3/2006 | 5/3/2006 | A | DONE |
Jack Frank
|
|
|
PLEASE CALL 1/2 HOUR BEFORE YOU HEAD OVER TO CHECK SERVICE ; Phone #: ###-#### Internet Inspection Request from: Tyler ok
|