ELE-Aging Inspection | 7/13/2006 | 7/13/2006 | 7/14/2006 | | PASS |
Mike Kinnear
|
|
|
ok final
|
Final | 7/14/2006 | 7/14/2006 | 7/14/2006 | A | PASS |
Mike Kinnear
|
|
|
ok final
|
Final | 5/11/2006 | 5/12/2006 | 5/12/2006 | A | NR |
Mike Kinnear
|
|
|
We are completely done and ready for FINAL. The sprinkler man is going to install / wire the sprinkler controller.Thanks !!!!!; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell needs to have power turned on before final called t/w dan
|
Rough-In Permanent Service | 5/11/2006 | 5/11/2006 | 5/11/2006 | P | PASS |
Mike Kinnear
|
|
|
We replaced the damaged overhead service and wiring to the pump. This is located between the old Blue Cross of Idaho building and the Motel on Federal Way. It is nearer the Motel in the open area.We are ready for the Service inspection so that Idaho Power will re-energize and then we'll come back to finish up the rest.(#6050453cp).John/###-####. Thanks!!!!; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok cover under ground conduit p/s o/h n ok
|