Final | 8/30/2006 | 8/30/2006 | 8/30/2006 | P | PASS |
Pat Lass
|
|
|
roger; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Electrical Rough-In | 6/30/2006 | 7/3/2006 | 7/3/2006 | A | PASS |
Jim Schmer
|
|
|
roger; Phone #: ###-#### for basement Internet Inspection Request from: Cathy Chiles
|
Rough-In Permanent Service | 6/30/2006 | 7/3/2006 | 7/3/2006 | A | PASS |
Jim Schmer
|
|
|
roger; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Electrical Rough-In | 6/27/2006 | 6/28/2006 | 6/28/2006 | A | PART |
Mike Kinnear
|
|
|
roger; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok cover ri nort east area
|
Electrical Rough-In | 6/19/2006 | 6/20/2006 | 6/20/2006 | A | PART |
Pat Lass
|
|
|
roger - 2nd floor insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley 2nd floor and 1st floor south wall and ceiling in south room.
|
Conference | 6/12/2006 | 6/12/2006 | 6/12/2006 | P | PART |
Pat Lass
|
|
|
roger; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover with concrete 2 in . feeder to disconnect
|
Conference | 5/11/2006 | 5/11/2006 | 5/11/2006 | P | PART |
Pat Lass
|
|
|
###-#### roger talked about location of main disconnect and encased in concrete raceway to be outside the building
|