Final | 6/30/2006 | 7/6/2006 | 7/6/2006 | A | PASS |
Mike Kinnear
|
|
|
Final ELE for Fab 3 Bench Shop Remodel. John Davis; Phone #: ###-#### Internet Inspection Request from: John Davis ok final
|
Electrical Rough-In | 6/2/2006 | 6/5/2006 | 6/5/2006 | A | PASS |
Mike Kinnear
|
|
|
Electrical wall rough-in in building 5. John Davis; Phone #: ###-#### Internet Inspection Request from: John Davis ok cover walls only
|
Electrical Rough-In | 5/18/2006 | 5/22/2006 | 5/22/2006 | A | PASS |
Mike Kinnear
|
|
|
Rough in wall inspection for Fab 3 bench shop. John Davis; Phone #: ###-#### Internet Inspection Request from: Paul Cook ok cover ri
|