Final | 9/14/2006 | 9/14/2006 | 9/14/2006 | A | PASS |
Mike Kinnear
|
|
|
solar post light Internet Inspection Request from: Melyne Davis correction made ok final
|
Final | 9/12/2006 | 9/12/2006 | 9/12/2006 | A | FAIL |
Bob Reichert
|
|
|
solar post light Internet Inspection Request from: Melyne Davis called, left message, left corr notice, nec 406.5 & 404.9 faceplates shall seat against mounting surface,406.4 recpt faces shall be flush with or project from faceplates,Bcc all make-up shall be done-mbr lites shall operate, 3-way switch up hall shall operate, garage gfci to left of panel shall operate
|
Rough-In Permanent Service | 5/24/2006 | 5/25/2006 | 5/25/2006 | A | PASS |
Jack Frank
|
|
|
Internet Inspection Request from: Melyne Davis r/i p/s u/g new ok
|