Final | 10/6/2006 | 10/9/2006 | 10/9/2006 | A | PASS |
Jack Frank
|
|
|
post light to be solar per builder.Final needed on house Internet Inspection Request from: Melyne Davis
|
Rough-In Permanent Service | 7/7/2006 | 7/7/2006 | 7/7/2006 | A | PASS |
Bob Reichert
|
|
|
Internet Inspection Request from: Melyne Davis called contr, ric ok, p/s u/g n ok
|