Final | 8/28/2006 | 8/28/2006 | 8/28/2006 | P | PASS |
Pat Lass
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Electrical Rough-In | 8/4/2006 | 8/7/2006 | 8/7/2006 | P | PART |
Pat Lass
|
|
|
gerald ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ceiling ok
|
Electrical Rough-In | 6/15/2006 | 6/16/2006 | 6/16/2006 | A | PASS |
Pat Lass
|
|
|
Ceiling rough-in . Contact Loren ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Steve Syltie
|
Electrical Rough-In | 6/9/2006 | 6/9/2006 | 6/9/2006 | P | PASS |
Pat Lass
|
|
|
Bathroom rough-in. contact Loren @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Steve Syltie R/I 4th floor restrooms ok
|