Final | 6/26/2007 | 6/28/2007 | 6/28/2007 | P | PASS |
William E Thomas
|
|
|
final on house & garage, Phone #: ###-#### Internet Inspection Request from: Andy Rose final ok
|
Electrical Rough-In | 8/31/2006 | 9/1/2006 | 9/1/2006 | P | PASS |
Mike Kinnear
|
|
|
inspection on underfloor heat cable in bathroom. Any questions call Andy @ ###-#### Internet Inspection Request from: Andy Rose ok cover floor heat
|
Rough-In Permanent Service | 6/8/2006 | 6/8/2006 | 6/8/2006 | P | PART |
Pat Lass
|
|
|
rough in inspection on house plus service, any questions call George @ ###-#### Internet Inspection Request from: Andy Rose R/I Ok install grounding bus and isolate neutral in main disconnect
|
Rough-In Permanent Service | 5/26/2006 | 5/26/2006 | 5/26/2006 | P | PART |
Jim Schmer
|
|
|
re inspection on corrections. any questions call Andy @ ###-#### Internet Inspection Request from: Andy Rose p/s o/h new ok & garage r/i only
|
Rough-In Permanent Service | 5/25/2006 | 5/26/2006 | 5/26/2006 | A | FAIL |
Bob Reichert
|
|
|
need inspection on new service plus wiring in garage.Call Andy @###-#### if any questions Internet Inspection Request from: Andy Rose called contr, left corr notice, NEC 230.24(B)(4) service drop conductors shall be min. 18' over public alley, 300.4(D) nm cable shall be 1 1/4" from edge of framing member,BCC all make-up shall be done without any devices installed
|