Final | 6/7/2006 | 6/7/2006 | 6/7/2006 | P | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 6/7/2006 at 7:36:40 AM. Contact: ###-####.
|
Final | 5/30/2006 | 5/30/2006 | 5/30/2006 | P | FAIL |
William E Thomas
|
|
|
keil ; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung 1. needs to have ground rod. 2. need to check fault current rating for the transformer next to service, and then see if the fuses are correct for the fault current.
|