Final | 6/11/2006 | 6/12/2006 | 6/12/2006 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/11/2006 at 8:46:44 PM. Contact: ###-####.
|
Electrical Rough-In | 6/12/2006 | 6/12/2006 | 6/12/2006 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/11/2006 at 8:46:44 PM. Contact: ###-####. survey posted label panel bond hot and cold pipe, shall not ID 6 or smaller neutral, derate or remove conductors from conduit
|
Conference | 5/31/2006 | 5/31/2006 | 5/31/2006 | P | DONE |
Jack Frank
|
|
|
mike ###-#### called told clearence for motor controls required clearence as 110.26 states, all wiring in wet location shall meet code for location, and motors require disconnect as 430 states no exceptions to what NEC requires
|