Final | 7/12/2007 | 7/13/2007 | 7/13/2007 | P | PASS |
Jack Frank
|
|
|
please call ###-#### after inspection Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa ok
|
Permanent Service | 7/11/2006 | 7/12/2006 | 7/12/2006 | A | PASS |
Jim Schmer
|
|
|
daniel; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley p/s u/g new - ok jms
|
Electrical Rough-In | 7/10/2006 | 7/10/2006 | 7/10/2006 | P | PASS |
Jim Schmer
|
|
|
please call first to discuss ufer ground; Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa
|
Electrical Rough-In | 6/7/2006 | 6/7/2006 | 6/7/2006 | P | FAIL |
Jack Frank
|
|
|
Rough in; Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa corr. do not cover called left message 300.4 nail plates 11/4" both edges 250.148 splice all equip grds 3 gang box MB bath, 314.20 all outside boxes shall be flush siding, 314.43 remove screws from all plastic boxes outside light, need approved set of plans at job site cannot complete r/i inspection if they are not there
|
Conference | 6/7/2006 | 6/7/2006 | 6/7/2006 | A | DONE |
Jack Frank
|
|
|
ok met contractor
|
Electrical Rough-In | 6/5/2006 | 6/5/2006 | 6/5/2006 | A | FAIL |
Jack Frank
|
|
|
rough in inspection; Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa called will meet with contr, nails on boxes, batyh and kit circuits all messed up needs bond screw, conn for GEC needs concrete encased electrode, 11/4" and nail plates, outlet for liv and dinn, approved plans at job
|