Final | 9/14/2006 | 9/15/2006 | 9/15/2006 | A | PASS |
Bob Reichert
|
|
|
WE ARE READY FOR FINAL INSPECTION OF THE THEATER ROOM. THERE WILL BE AN EMPLOYEE OF THE STORE THERE ANY TIME AFTER 9:00 AM. BREN WOULD BE THE BEST CONTACT AT THE STORE AND IF YOU HAVE ANY OTHER QUESTIONS, PLEASE FEEL FREE TO CONTACT BRIAN KEITH AT THE OFFICE AT ###-####. THANK YOU.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH ok to final
|
ELE-Aging Inspection | 8/14/2006 | 8/14/2006 | 8/14/2006 | | NR |
Bob Reichert
|
|
|
called, suc
|
Electrical Rough-In | 6/13/2006 | 6/13/2006 | 6/13/2006 | P | PASS |
Mike Kinnear
|
|
|
NEED ROUGH- IN ON NEW PANEL. THANK YOU.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH ok cover walls & ceiling sub panel area
|
Electrical Rough-In | 6/6/2006 | 6/7/2006 | 6/7/2006 | A | PASS |
Pat Lass
|
|
|
We are ready for rough-in inspection with the corrections. We will have people on site by 9:00 working on the Panel and the Feeder to the Panel along with the employees from the Stereo Shoppe. If you have any questions, you can contact Brian Keith at ###-####. Thank you.; Phone #: ###-####
|
Electrical Rough-In | 6/5/2006 | 6/6/2006 | 6/6/2006 | A | FAIL |
Bob Reichert
|
|
|
WE ARE READY FOR A ROUGH-IN FOR COVER FOR THE THEATER AND EQUIPMENT ROOM. THE PANEL IS NOT READY FOR INSPECTION AT THIS TIME. WE WOULD LIKE TO HAVE THE OK TO COVER IN THE THEATER ROOM WHILE WE COMPLETE THE SUB-PANEL. THE STORE DOES NOT OPEN UNTIL 10:00 AM, YOU CAN ASK FOR GREG NETTLES OR CRAIG ADAMS AT THE STORE.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH called contr, left corr notice, 300.4(A)&(D) edge of holes and cables and raceways shall be 1 1/4" from edge of framing members, 352 & 362 there shall be not more than 4 quarter bends in raceway between pull points,BCC no u/g shall be covered before inspection
|