Final | 9/18/2006 | 9/19/2006 | 9/19/2006 | A | PASS |
Pat Lass
|
|
|
wayne; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Rough-In Permanent Service | 6/16/2006 | 6/19/2006 | 6/19/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/16/2006 at 4:22:35 PM. Contact: ###-####. corr made, ric ok, p/s u/g n ok
|
Rough-In Permanent Service | 6/12/2006 | 6/12/2006 | 6/12/2006 | P | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/12/2006 at 10:52:43 AM. Contact: ###-####. corrections not complete, called contr, will recall
|
Rough-In Permanent Service | 6/7/2006 | 6/8/2006 | 6/8/2006 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/7/2006 at 12:05:29 PM. Contact: ###-####. called contr, left corr notice, nec 250.56 rod electrode shall be augmented by additional electrode, Note: access required to panel, 300.4(A)&(D) edge of holes and nm cable shall be 1 1/4" from edge of framing member, 334.80 where more than 2 nm cables are bundled through hole to be draft stopped, they shall be derated, 314.16 boxes shall be sufficient size to provide free space for all conductors,314.20 boxes in combustible walls shall be flush with finished surface, 314.27 box shall be installed for luminaire(back door), BCC all make-up shall be done, Note: tub access shall be min 20" w x 15" h
|