Final | 1/17/2007 | 1/18/2007 | 1/18/2007 | A | PASS |
Pat Lass
|
|
|
warren Note: call for access; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Final | 1/16/2007 | 1/17/2007 | 1/17/2007 | A | CANC |
Bob Reichert
|
|
|
warren , note call 1st for access code; Phone #: ###-#### Internet Inspection Request from: Victoria Beall called contr, no access due to treated hardwood floors, said to call for later
|
Electrical Rough-In | 8/1/2006 | 8/2/2006 | 8/2/2006 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 8/1/2006 at 10:09:13 PM. Contact: ###-####.
|
Permanent Service | 8/2/2006 | 8/2/2006 | 8/2/2006 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 8/1/2006 at 10:09:13 PM. Contact: ###-####. P/S U/G N Ok
|
Electrical Rough-In | 7/31/2006 | 7/31/2006 | 7/31/2006 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/31/2006 at 7:58:28 AM. Contact: ###-####. R/I OK
|
Electrical Rough-In | 7/27/2006 | 7/27/2006 | 7/27/2006 | P | PASS |
Mike Kinnear
|
|
|
warren Note: ufier; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok cover ground wire with concrete
|
Electrical Rough-In | 7/24/2006 | 7/24/2006 | 7/24/2006 | P | FAIL |
Pat Lass
|
|
|
warren Note: ufier; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles electrode not at footing
|
Conference | 7/6/2006 | 7/7/2006 | 7/7/2006 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 7/6/2006 at 7:12:35 PM. Contact: ###-####. conf regarding ufer ground need to install 20 ft #4 cu copper at footing & foundation under 2inch concrete with inspection before concrete pour & after
|