Final | 11/26/2007 | 11/26/2007 | 11/26/2007 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/26/2007 at 6:26:42 AM. Contact: ###-####.
|
Final | 11/21/2007 | 11/23/2007 | 11/23/2007 | A | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/21/2007 at 4:28:08 PM. Contact: ###-####. did walk through open boxes, lights not working, unused openings, inuse covers required for all receps in garage, make ac disconnects raintight. receps to work in penthouse and outside by sidewalk, remove tenp power cords
|
Electrical Rough-In | 11/8/2007 | 11/9/2007 | 11/9/2007 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/8/2007 at 3:06:48 PM. Contact: ###-####. underground on main st. ok
|
Electrical Rough-In | 10/19/2007 | 10/19/2007 | 10/19/2007 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/19/2007 at 6:53:52 AM. Contact: ###-####. fire pump room on 2nd floor ok
|
Electrical Rough-In | 10/1/2007 | 10/1/2007 | 10/1/2007 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/1/2007 at 6:53:19 AM. Contact: ###-####. anop
|
Electrical Rough-In | 8/30/2007 | 8/30/2007 | 8/30/2007 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 8/30/2007 at 7:14:30 AM. Contact: ###-####. anop
|
Electrical Rough-In | 8/16/2007 | 8/16/2007 | 8/16/2007 | A | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 8/16/2007 at 7:06:38 AM. Contact: ###-####. 1. as noted on prints ok for cover.
|
Electrical Rough-In | 8/6/2007 | 8/7/2007 | 8/7/2007 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 8/6/2007 at 2:54:09 PM. Contact: ###-####. north parking garage ceiling anop
|
Electrical Rough-In | 7/26/2007 | 7/27/2007 | 7/27/2007 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/26/2007 at 1:46:26 PM. Contact: ###-####. allarm and door circuit runs ok
|
Electrical Rough-In | 5/16/2007 | 5/16/2007 | 5/16/2007 | A | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 5/16/2007 at 7:29:40 AM. Contact: ###-####. 1. shafts ok to cover-- stair#1, stair#2 2. residential meter packs are ok to heat up, p/s u/g n ok--all that is needed are the meters for each seperate condo. 3. Any questions inspector #432 looked at service in basement. ###-####
|
Electrical Rough-In | 5/11/2007 | 5/11/2007 | 5/11/2007 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 5/11/2007 at 8:54:25 AM. Contact: ###-####. outside lighting on first floor ok ANOP
|
Electrical Rough-In | 4/12/2007 | 4/13/2007 | 4/13/2007 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 4/12/2007 at 1:57:47 PM. Contact: ###-####. 3rd floor ceiling and stairwell ANOP
|
Electrical Rough-In | 3/27/2007 | 3/28/2007 | 3/28/2007 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 3/27/2007 at 2:02:51 PM. Contact: ###-####. center stairwell anop ok
|
Electrical Rough-In | 2/21/2007 | 2/22/2007 | 2/22/2007 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 2/21/2007 at 3:55:54 PM. Contact: ###-####.
|
Permanent Service | 2/22/2007 | 2/22/2007 | 2/22/2007 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 2/21/2007 at 3:55:54 PM. Contact: ###-####. P/S U/G N Ok
|
Electrical Rough-In | 2/13/2007 | 2/14/2007 | 2/14/2007 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 2/13/2007 at 3:06:59 PM. Contact: ###-####. penthouse ceiling R/I Ok Had conf about grounding
|
Final | 12/20/2006 | 12/20/2006 | 12/20/2006 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/20/2006 at 7:57:55 AM. Contact: ###-####. U/G anop
|
Electrical Rough-In | 12/1/2006 | 12/1/2006 | 12/1/2006 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/1/2006 at 11:20:37 AM. Contact: ###-####. partial U/G ANOP in equipment room
|
Electrical Rough-In | 9/5/2006 | 9/5/2006 | 9/5/2006 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/5/2006 at 8:42:02 AM. Contact: ###-####. partial U/G On main floor and electrical room
|
Electrical Rough-In | 7/6/2006 | 7/6/2006 | 7/6/2006 | P | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 7/6/2006 at 10:13:03 AM. Contact: ###-####. ufer grd - ok jms
|