Final | 10/30/2006 | 10/30/2006 | 10/30/2006 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/30/2006 at 7:15:37 AM. Contact: ###-####. ok survey posted called, 210.70 3-4 way for stairs 408.4 panel directory sall be specific as to location and purpose of circuits
|
Rough-In Permanent Service | 7/10/2006 | 7/12/2006 | 7/12/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/10/2006 at 11:31:09 AM. Contact: ###-####. ric ok, p/s u/g n ok
|