Final | 11/28/2006 | 11/28/2006 | 11/28/2006 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/28/2006 at 6:31:04 AM. Contact: ###-####. ok
|
Rough-In Permanent Service | 7/24/2006 | 7/24/2006 | 7/24/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/24/2006 at 7:05:14 AM. Contact: ###-####. corr made, ric ok, p/s u/g n ok
|
Rough-In Permanent Service | 7/20/2006 | 7/20/2006 | 7/20/2006 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/20/2006 at 6:51:44 AM. Contact: ###-####. called, left message, nec 300.4(A) edge of holes shall be 1 1/4" from edge of framing members, 210.52(A) there shall be an outlet in 2' wall of kitchen, 334.30 nm cable shall be stapled within 12" of panel, BCC all make-up shall be done, address shall be posted, job id sticker shall be posted,Note, provide ground wire for lv on outside of house
|