Final | 9/1/2006 | 9/5/2006 | 9/5/2006 | A | PASS |
Jack Frank
|
|
|
meet owner between 7:30,and 8:00 AM ok
|
Final | 9/1/2006 | 9/1/2006 | 9/1/2006 | P | CANC |
Jack Frank
|
|
|
need final on service upgrade for new a/c. thank you. please call Pat Harris for access @ ###-####. thank you.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH rescheduled with owner for 09-05-06 in the AM before 8:00
|
Final | 7/28/2006 | 7/31/2006 | 7/31/2006 | P | FAIL |
Jack Frank
|
|
|
need final on service upgrade. please call Pat @ ###-#### 30min b4 for access. thank you.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH called corr needs to grd or bond water syatem with # 4 copper 250.52(A)(1) or 104(A)(1)
|
Rough-In Permanent Service | 7/31/2006 | 7/31/2006 | 7/31/2006 | P | PASS |
Jack Frank
|
|
|
need final on service upgrade. please call Pat @ ###-#### 30min b4 for access. thank you.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH p/s o/h rec. ok r/i ok
|