Final | 1/30/2008 | 1/30/2008 | 1/30/2008 | P | PASS |
Bob Reichert
|
|
|
talked with contractor, ok to final
|
ELE-Aging Inspection | 1/24/2008 | 1/24/2008 | 1/28/2008 | | DONE |
Bob Reichert
|
|
|
called, left message to call for final, drove by, church not open
|
Electrical Rough-In | 8/6/2006 | 8/7/2006 | 8/7/2006 | A | PASS |
Pat Lass
|
|
|
Doors should be open from 0###-#### hrs; Phone #: ###-#### Internet Inspection Request from: KENT JONES
|
Electrical Rough-In | 8/3/2006 | 8/4/2006 | 8/4/2006 | A | NH |
Jack Frank
|
|
|
Park in parking lot on North side and use doors facing North parking lot. Doors open in morning. Enter and take hallway to right. Work performed in 2nd door on left; Phone #: ###-#### Internet Inspection Request from: KENT JONES notice posted called
|