Final | 11/9/2006 | 11/9/2006 | 11/9/2006 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/9/2006 at 9:11:08 AM. Contact: ###-####. called needs to istall shower trim and vanity lights, and remove recept wiring tub area final ok
|
Rough-In Permanent Service | 8/8/2006 | 8/8/2006 | 8/8/2006 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 8/8/2006 at 9:42:59 AM. Contact: ###-####. corr made, ric ok, p/s u/g n ok
|
Rough-In Permanent Service | 8/7/2006 | 8/7/2006 | 8/7/2006 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 8/7/2006 at 10:09:41 AM. Contact: ###-####. corr. do not cover posted called 300.4(A)(1) & (D) nail plates and 11/4" from inside or outside edges, 300.14 free conductor almost every box grd wires, 210.52(A) needs outlet in din. rm 1 wall, downstairs bed rm left of door and over 6ft from closet door334.23 protect cables by attic access, BCC complete all makeup
|