Final | 10/5/2006 | 10/6/2006 | 10/6/2006 | A | PASS |
Pat Lass
|
|
|
susan ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Electrical Rough-In | 9/13/2006 | 9/14/2006 | 9/14/2006 | P | PASS |
Bob Reichert
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley rest of ri ok, will call for final ltr
|
Electrical Rough-In | 9/5/2006 | 9/5/2006 | 9/5/2006 | P | PART |
Pat Lass
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to rock. check make-up in all boxes and connectors in panel on next inspection also main bonding jumper.
|
Electrical Rough-In | 8/31/2006 | 9/1/2006 | 9/1/2006 | A | CANC |
William E Thomas
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles unable to locate address, called number given and no answer.
|
Electrical Rough-In | 8/29/2006 | 8/29/2006 | 8/29/2006 | P | PART |
Bob Reichert
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to cover gec, and feeder to shop
|
Electrical Rough-In | 8/28/2006 | 8/28/2006 | 8/28/2006 | P | PASS |
Bob Reichert
|
|
|
ok to pour gec, need to see before backfill
|
Conference | 8/7/2006 | 8/7/2006 | 8/7/2006 | P | DONE |
Bob Reichert
|
|
|
###-#### michael talked about concrete encased electrode for shop, circuits for shop, 1 1/4" flush boxes, circuit from house
|