Final | 10/25/2006 | 10/25/2006 | 10/25/2006 | P | PASS |
Pat Lass
|
|
|
reinspect all should be fine now; Phone #: ###-#### Internet Inspection Request from: Don Lustig
|
Final | 10/23/2006 | 10/24/2006 | 10/24/2006 | P | FAIL |
Pat Lass
|
|
|
Hot Tub rewired grounding done garage and house trimed out home owner will be home for questions and access; Phone #: ###-#### Internet Inspection Request from: Don Lustig poen neutral in bathroom receps and bond grate by hot tub
|
Permanent Service | 10/6/2006 | 10/6/2006 | 10/6/2006 | P | PART |
Pat Lass
|
|
|
inspection later afernoon for rehook of power alt contact at Mike ###-#### Internet Inspection Request from: Don Lustig P/S O/H R Ok to connect power has ground rod check water later.
|
Electrical Rough-In | 9/8/2006 | 9/8/2006 | 9/8/2006 | A | PART |
William E Thomas
|
|
|
upstairs addition ready for RI and underground to garage thanks; Phone #: ###-#### Internet Inspection Request from: Don Lustig 1. upstairs and underground for new electrical work ok 2. conduit depth for existing spa conduit at 6", needs to be at 18".
|
Electrical Rough-In | 8/14/2006 | 8/14/2006 | 8/14/2006 | A | PART |
Pat Lass
|
|
|
Need wires inspected in attic before plywood goes down mid to later morning prefered mike will be on site; Phone #: ###-#### Internet Inspection Request from: Don Lustig under floor inspecthon ok
|