Final | 11/7/2006 | 11/8/2006 | 11/8/2006 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/7/2006 at 2:44:03 PM. Contact: ###-####.
|
Electrical Rough-In | 8/14/2006 | 8/15/2006 | 8/15/2006 | A | PASS |
Pat Lass
|
|
|
u-pher ground inspection please///alan; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
|
Rough-In Permanent Service | 8/11/2006 | 8/14/2006 | 8/14/2006 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Alan Lusk called contr to chg recpt location up bedroom, add recpt in kitchen, finish make-up, change room count to 20 rooms, ok to pour gec, told to call for inspection before backfill gec, ric ok, p/s u/g n ok
|