Final | 11/7/2006 | 11/7/2006 | 11/7/2006 | P | PASS |
Bob Reichert
|
|
|
thomas ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith corr made, ok to final
|
Final | 10/23/2006 | 10/23/2006 | 10/23/2006 | P | FAIL |
Bob Reichert
|
|
|
thomas ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith told owner, left corr notice, nec 408.4 every circuit shall be clear, concise, and specific purpose identified, and allow each circuit to be distinguished from others, 110.12(A) unused openings in panel shall be closed, 404.9(A) faceplates shall be installed, BCC all wiring shall be done for final(outside lights), NOTE: hot tub wiring shall be done by licensed electrical contractor
|
Electrical Rough-In | 8/24/2006 | 8/25/2006 | 8/25/2006 | A | PASS |
Mike Kinnear
|
|
|
Ken; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt corrections made ok cover ri
|
Electrical Rough-In | 8/23/2006 | 8/23/2006 | 8/23/2006 | P | PART |
Jack Frank
|
|
|
###-#### ken ok for insulation only, corr. met owner's father, needs grd pigtails for switches, and 6" free length of conductor for all equip grds, told them that at time of conference
|
Permanent Service | 8/17/2006 | 8/18/2006 | 8/18/2006 | P | PASS |
Jack Frank
|
|
|
matt - call prior to insp (Id.P reconnect at 3pm); Phone #: ###-#### Internet Inspection Request from: Barbara Buckley p/s u/g rec. ok
|
Conference | 8/11/2006 | 8/14/2006 | 8/14/2006 | A | DONE |
Jack Frank
|
|
|
matt - call 1/2hr prior to meet there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok
|