Final | 2/8/2007 | 2/9/2007 | 2/9/2007 | P | PASS |
Pat Lass
|
|
|
9th floor final contact #chris Phone #: ###-####
|
Electrical Rough-In | 1/4/2007 | 1/4/2007 | 1/4/2007 | P | CANC |
Pat Lass
|
|
|
ceiling inspection ###-#### wrong permit called in the 8th floor was the right one.
|
Final | 10/12/2006 | 10/13/2006 | 10/13/2006 | A | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/12/2006 at 7:53:24 PM. Contact: ###-####. onlu the floor has been inspected on this small section of the 9th floor
|
Final | 10/11/2006 | 10/12/2006 | 10/12/2006 | A | NR |
Pat Lass
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Patricia Smith enclose open wires in boxes and finish reception area
|
Electrical Rough-In | 9/14/2006 | 9/15/2006 | 9/15/2006 | A | PART |
Pat Lass
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles hard lids ok
|
Electrical Rough-In | 9/5/2006 | 9/5/2006 | 9/5/2006 | P | PART |
Pat Lass
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles underfloor ok
|
Electrical Rough-In | 9/1/2006 | 9/5/2006 | 9/5/2006 | A | FAIL |
Pat Lass
|
|
|
chris - around 8:30am ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley not finished supporting the wiring.
|
Electrical Rough-In | 9/1/2006 | 9/1/2006 | 9/1/2006 | P | FAIL |
Pat Lass
|
|
|
chris - under floor ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley flex not properly supported and not enough tiles out to do a full inspection.
|
Electrical Rough-In | 8/30/2006 | 8/30/2006 | 8/30/2006 | P | CANC |
Pat Lass
|
|
|
chris -9th floor- under floor insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie - canceled by contractor
|