Final | 12/14/2006 | 12/14/2006 | 12/14/2006 | P | PASS |
Pat Lass
|
|
|
Steven Note: call 10 min before 7th floor; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
|
Final | 11/1/2006 | 11/2/2006 | 11/2/2006 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/1/2006 at 4:23:09 PM. Contact: ###-####. signed T/O missing fixtures in conf. room behind reception area
|
Final | 10/31/2006 | 10/31/2006 | 10/31/2006 | P | PART |
Pat Lass
|
|
|
Steven, 7th floor - needs at least a temporary please if possible; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt furniture is listed but not yet hooked up and 1 area is not finished .
|
Electrical Rough-In | 10/5/2006 | 10/6/2006 | 10/6/2006 | A | PASS |
Pat Lass
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 7th floor ceiling ok
|
Electrical Rough-In | 9/28/2006 | 9/29/2006 | 9/29/2006 | P | FAIL |
Pat Lass
|
|
|
joe ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley support in ceiling and unused openings
|
Electrical Rough-In | 8/23/2006 | 8/24/2006 | 8/24/2006 | P | PART |
Pat Lass
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt wall R/I Ok
|